2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Metamorfosis (Athens area): 2 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.221
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · 8+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Metamorfosis (Athens area), Greece | · · · | $0.221 | 2 | — |
| Italy | · · · | $0.323 | 38 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Metamorfosis (Athens area), Greece?
No published wholesale $/kW benchmark exists for Metamorfosis (Athens area), Greece yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Metamorfosis (Athens area), Greece?
Commercial electricity in Metamorfosis (Athens area), Greece is $0.221 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Metamorfosis (Athens area), Greece?
Metamorfosis (Athens area), Greece sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Metamorfosis (Athens area), Greece market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| TI Sparkle Metamorfosis II | Telecom Italia Sparkle | 7.7 | III | Operational |
| TI Sparkle Metamorfosis (I) | Telecom Italia Sparkle | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.