2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Ciudad de Guatemala: 2 facilities, colocation pricing
How many data centers are in Ciudad de Guatemala?
Coloprice tracks 2 data centers in Ciudad de Guatemala, Guatemala: 2 operational, 0 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.198
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Ciudad de Guatemala, Guatemala | · · · | $0.198 | 2 | — |
| Mexico | $260 | $0.241 | 72 | — |
| El Salvador | · · · | $0.240 | 3 | — |
| Honduras | · · · | $0.186 | 5 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Ciudad de Guatemala?
Coloprice tracks 2 data centers in Ciudad de Guatemala, Guatemala: 2 operational, 0 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Ciudad de Guatemala?
By number of facilities tracked: Emerging Networks Guatemala (1), GBM de Guatemala, S.A. (1).
How much does colocation cost in Ciudad de Guatemala, Guatemala?
No published wholesale $/kW benchmark exists for Ciudad de Guatemala, Guatemala yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Ciudad de Guatemala, Guatemala?
Commercial electricity in Ciudad de Guatemala, Guatemala is $0.198 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Ciudad de Guatemala, Guatemala?
On power alone, Honduras ($0.186/kWh) run below Ciudad de Guatemala, Guatemala. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Ciudad de Guatemala, Guatemala market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Emerging Networks Guatemala Datacenter Orión | Emerging Networks Guatemala | — | III | Operational |
| GBM de Guatemala Data Center Zona Pradera, Fase 1 | GBM de Guatemala, S.A. | — | III | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Ciudad de Guatemala: free, reply within one business day
Get Quotes →