Data Center Colocation Costs in Iceland: Q3 2026 Price Index

Compare 3 data centers in Iceland across 1 operators, 136 MW: capacity, status, certifications, facilities and colocation pricing context.

3 facilities136 MW tracked1 operators

Colocation pricing: Iceland & other markets — The Colocation Price Index → · Best data centers in Iceland →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.106

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 AI-ready · 136+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Iceland· · ·$0.1063
Norway· · ·$0.1268
Denmark· · ·$0.28610
United Kingdom· · ·$0.454104

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Iceland joins the index through atNorth's three Icelandic sites — Reykjavík, Keflavík and Akureyri — which together account for roughly 136 MW of disclosed IT capacity, led by the 83 MW Keflavík mega site next to the international airport. All three run on Iceland's geothermal- and hydro-dominated grid, and business power here prices as the cheapest in this index by a wide margin at $0.106/kWh, less than half Germany's rate. None of the three carries an independent Uptime Institute Tier certification: atNorth markets its Icelandic sites as 'Tier 3' in its own materials, but a direct search of Uptime's public registry turns up no confirmed Icelandic award. All three sites are built with liquid-cooling-ready whitespace and average 40 kW rack densities, positioning Iceland's near-zero-carbon power and cool climate as an AI-training pitch rather than a Tier-certification one.

Frequently asked questions

How much does colocation cost in Iceland?

No published wholesale $/kW benchmark exists for Iceland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Iceland?

Commercial electricity in Iceland is $0.106 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Iceland?

Iceland sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Iceland market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Iceland?

Coloprice tracks 3 data centers in Iceland: 3 operational with 136 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
atNorth ICE01 Reykjavik Metro SiteatNorthIcelandReykjavík3.234EOperational
atNorth ICE02 Keflavik Mega SiteatNorthIcelandKeflavík8341DOperational
atNorth ICE03 Akureyri Mega SiteatNorthIcelandAkureyri5041DOperational