Data Center Colocation Costs in Denmark: Q3 2026 Price Index

Compare 5 data centers in Denmark across 2 operators, 72 MW: capacity, status, certifications, facilities and colocation pricing context.

5 facilities72 MW tracked2 operators

Colocation pricing: Denmark & other markets — The Colocation Price Index → · Best data centers in Denmark →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.286

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 72+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Denmark· · ·$0.2865
Germany· · ·$0.28390

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Digital Realty (Interxion) is currently the only operator represented in Denmark in the catalog, with four disclosed facilities — three in Ballerup (CPH1, CPH2, CPH3) and one in Valby (CPH-RS) — and zero published power capacity in MW. CPH1, the largest by floor space at roughly 8,000 sqm, carries a CarbonNeutral certification alongside the operator’s standard ISO/SOC/PCI DSS stack; CPH-RS, the smallest of the four, is CarbonNeutral certified as well. Commercial electricity runs $0.286/kWh (GlobalPetrolPrices, Dec 2025), reflecting Denmark’s wind-heavy grid — the country leads Europe in wind generation share. Danish rules also require large data centers to return waste heat to district heating networks, a factor shaping campus design around Copenhagen independent of any single site’s published specs. Coverage is a single operator’s public disclosure, not the full Copenhagen market — an early marker for a country the catalog has only just begun to track.

Frequently asked questions

How much does colocation cost in Denmark?

No published wholesale $/kW benchmark exists for Denmark yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Denmark?

Commercial electricity in Denmark is $0.286 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Denmark?

On power alone, Germany ($0.283/kWh) run below Denmark. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Denmark market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Denmark?

Coloprice tracks 5 data centers in Denmark: 4 operational, 1 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
CPH-RSDigital Realty (Interxion)DenmarkCopenhagen34EOperational
CPH1Digital Realty (Interxion)DenmarkBallerup38DOperational
CPH2Digital Realty (Interxion)DenmarkBallerup38DOperational
CPH3Digital Realty (Interxion)DenmarkBallerup38DOperational
STACK COP02STACK InfrastructureDenmarkCopenhagen7218·Under construction