▮▮Coloprice

Yotta D1

Operational

Knowledge Park V, Greater Noida, Uttar Pradesh, India

Yotta D1 is a data center (Uptime Tier III, self-declared) in Greater Noida, India, operated by Yotta Data Services, with 30 MW of published IT capacity, currently operational, opened in 2022.

North India's first hyperscale data center — 30 MW of IT power, 5,000 racks and 300,000 sq ft in Greater Noida's Knowledge Park V, backed by dual 220 kV feeders and 48-hour power backup.

Yotta D1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Yotta Data Services
City
Greater Noida, India
Power, MW
30 MW
Cooling
Air
Uptime Tier
III · self-declared
Opened
2022
Floor space
27,871 m²
Racks
5,000
AI-ready
Yes
Tier III Certified
D

Coloprice Score

48 out of 100

Class D · #19 of 125 in India

  • Resilience11/35
  • Compliance0/20
  • Transparency14/20
  • Scale13/15
  • Maturity10/10
How the score is calculated →
Embed score badge
Yotta D1 — Coloprice Score 48
<a href="https://coloprice.com/data-centers/india/greater-noida/yotta-d1-greater-noida/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/yotta-d1-greater-noida.svg"
    alt="Yotta D1 — Coloprice Score 48" height="64">
</a>

Connectivity: 14 networks and 2 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Yotta D1 — Top 25 data centers in India 2026
#19 of 125 · See the list →

Yotta D1 opened on 31 October 2022 in Knowledge Park V, Greater Noida, as North India's first hyperscale data center, extending Yotta's footprint beyond its flagship Navi Mumbai campus into the Delhi-NCR market. The building offers 300,000 sq ft of space and 5,000 racks at 30 MW of IT power, with the operator quoting a design PUE of 1.4. Power arrives through dual 220 kV feeders feeding an on-site substation, backed by UPS and diesel generators sized for 48 hours of autonomy. Yotta positions D1 as Tier III Certified and the first of a planned six-building park on the site, chosen partly for a location the company describes as free of any history of natural or artificial disasters. The facility targets enterprises, hyperscalers and government tenants in North India that previously had to route capacity through Mumbai or Chennai, offering low-latency colocation closer to the National Capital Region's demand base alongside Yotta's broader push into AI-ready infrastructure.

  • North India's first hyperscale data center; opened 31 October 2022
  • 30 MW IT power, 5,000 racks, 300,000 sq ft
  • Dual 220 kV feeders with 48-hour backup power
  • Design PUE 1.4; Tier III Certified
  • First of a planned six-building data center park

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification