177 facilities · 41 operators · 8,889 MW tracked
Colocation in India: pricing, providers and markets
41 operators run 177 tracked data centers in India across 11 cities with at least three sites (123 operational, 8,889+ MW published, 42 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in India?
41 operators run 177 tracked data centers in India; the largest by sites is ST Telemedia Global Data Centres (India) (32). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in India publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in India
Operators with tracked data centers in India, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| ST Telemedia Global Data Centres (India) | 32 / 20 | 635 | STT Pune 1 | ISO 14001:2015, ISO/IEC 20000-1:2018, ISO/IEC 27001:2013 | 6 |
| Nxtra Data | 22 / 22 | 234 | Nxtra Mumbai 3 (Mahape) | not published | — |
| NTT Global Data Centers | 17 / 13 | 301 | NTT Mumbai Chandivali Data Center Park | ISO 27001, ISO 9001, PCI DSS | — |
| CtrlS Datacenters | 10 / 8 | 252 | CtrlS Chennai Data Center Park | TIA-942 Rated 4, ISO 27001, ISO 22301 | 3 |
| Iron Mountain | 10 / 7 | 162 | Iron Mountain CHN-1 | SOC 1, SOC 2, PCI-DSS | 3 |
| Sify Technologies | 8 / 8 | 121 | Sify Rabale Data Center Campus (Tower 5) | ISO 45001:2018, SOC 2 Type 2, ISO 20000-1:2018 | 2 |
| BSNL (Dimension Data) | 6 / 6 | not published | BSNL Internet Data Centre — Ahmedabad | Tier III (Uptime Institute), ISO 27001 | — |
| AdaniConneX | 5 / 1 | 2,033 | AdaniConneX Chennai 1 | IGBC Platinum (pre-certified), ISO 9001, ISO 14001 | — |
| Yotta Data Services | 5 / 3 | 171 | Yotta NM1 | Uptime Tier IV, Uptime TCOS Gold, Tier III Certified | 4 |
| ESDS Software Solution | 5 / 5 | 1 | ESDS Airoli Data Center | ANSI/TIA-942-B Facility - Rated 3 | — |
| Equinix | 5 / 5 | not published | Equinix MB2 | ISO 22301, ISO 27001, ISO 9001 | 2 |
| Princeton Digital Group | 4 / 1 | 432 | PDG MU1 Navi Mumbai | Uptime Tier III (Design and Construction), IGBC Platinum, OCP Ready | 2 |
| CapitaLand India Trust | 4 / 2 | 258 | CapitaLand Data Centre Navi Mumbai 1 | ANSI/TIA-942-C Design - Rated 3, ANSI/TIA-942-B Facility - Rated 3, ANSI/TIA-942-B Design - Rated 3 | 1 |
| Pi Data Centers | 4 / 1 | 66 | Pi Amaravati Data Center | Uptime Institute Tier IV Certification of Design Documents | 2 |
| Techno Digital (Techno Electric) | 3 / 1 | 93 | Techno Digital Chennai | ANSI/TIA-942-B Facility - Rated 3 | 2 |
| Anant Raj Cloud (Ashok Cloud) | 3 / 1 | 71 | Anant Raj Cloud Manesar | ANSI/TIA-942-B Facility - Rated 3, ANSI/TIA-942-B Design - Rated 3, ANSI/TIA-942-C Design - Rated 3 | — |
| STT GDC India | 3 / 3 | 67 | STT Hyderabad 1 | TIA-942 Rated 3, ISO 45001, LEED | 1 |
| RackBank | 3 / 0 | not published | RackBank WST1 (Navi Mumbai) | TIA-942 Rated 3, ISO 9001:2015, ISO 27001:2013 | 3 |
| RailTel Corporation of India | 3 / 3 | not published | RailTel Data Centre — Gurugram | Tier III Certification of Design Documents (Uptime Institute), Tier III Certification of Constructed Facility (Uptime Institute), ISO 27001:2022 | — |
| AirTrunk | 2 / 0 | 371 | AirTrunk HYD1 | not published | 2 |
| Colt DCS | 2 / 0 | 118 | Colt Mumbai 1 & 2 Data Centres | IGBC Platinum Rating pre-certification (Indian Green Building Council) | — |
| Digital Connexion | 2 / 1 | 40 | Digital Connexion BOM10 | not published | — |
| Colt Data Centre Services / RMZ | 1 / 0 | 1,250 | Colt DCS / RMZ Visakhapatnam Digital Campus | not published | 1 |
| HyperVault (TCS) | 1 / 0 | 1,000 | HyperVault Future City Campus | not published | 1 |
| HyperVault AI Data Center (Tata Consultancy Services unit, with TPG) | 1 / 0 | 1,000 | TCS HyperVault AI Data Center Campus | not published | 1 |
| Reliance Industries (built-to-suit for Meta) | 1 / 0 | 168 | Meta-Reliance AI Data Center Jamnagar | not published | 1 |
| L&T Cloudfiniti (Larsen & Toubro) | 1 / 1 | 30 | L&T-Cloudfiniti SPD1 | IGBC Platinum (Indian Green Building Council) | 1 |
| GPX Global Systems | 1 / 1 | 16 | GPX Mumbai 2 | ANSI/TIA-942-B Design - Rated 4 | — |
| Amazon Web Services (AWS) | 1 / 0 | not published | AWS Bharat Future City Data Center | not published | 1 |
| Bridge Data Centres | 1 / 0 | not published | Bridge Data Centres BBY01 | not published | — |
| Cyfuture | 1 / 1 | not published | Cyfuture Cloud Data Center Chennai | ISO 9001, ISO 27001 | — |
| Digital Edge | 1 / 1 | not published | Digital Edge BOM1 | ANSI/TIA-942-C Facility - Rated 3 | 1 |
| Globalcom IDC Limited | 1 / 1 | not published | Globalcom IDC-4 Data Center, Phase 1 | Tier III Certification of Design Documents (Uptime Institute) | — |
| Google / AdaniConneX / Airtel | 1 / 0 | not published | Google AI Hub Visakhapatnam | not published | 1 |
| Infibeam Avenues | 1 / 1 | not published | Infibeam GIFT Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| Jio Platforms (Reliance) | 1 / 1 | not published | Reliance Data Centre IDC2 | not published | — |
| Microsoft | 1 / 1 | not published | Microsoft Azure India South Central Region — Hyderabad | not published | 1 |
| NetDataVault (NGBPS Limited) | 1 / 1 | not published | NetDataVault Bhiwadi | ANSI/TIA-942-B Design - Rated 3 | — |
| NxtGen Datacenter & Cloud Technologies | 1 / 1 | not published | NxtGen High Density Datacenter (HDDC) | ANSI/TIA-942-C Rated 3 Constructed Facility | — |
| OVHcloud | 1 / 1 | not published | OVHcloud Mumbai Data Center | not published | — |
| Trimax IT Infrastructure and Services | 1 / 1 | not published | Trimax Data Center Airoli | ANSI/TIA-942-A Facility - Rated 3 | — |
Colocation markets in India
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Mumbai | 30 | 712 |
| Colocation in Chennai | 25 | 899 |
| Colocation in Navi Mumbai | 25 | 1,688 |
| Colocation in Noida | 15 | 376 |
| Colocation in Bengaluru | 14 | 86 |
| Colocation in Hyderabad | 14 | 3,027 |
| Colocation in Pune | 11 | 382 |
| Colocation in Kolkata | 7 | 50 |
| Colocation in Ahmedabad (GIFT City) | 3 | 13 |
| Colocation in Delhi (Bangla Sahib) | 3 | 12 |
| Colocation in Manesar | 3 | 34 |
Availability in India: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in India?
By tracked sites: ST Telemedia Global Data Centres (India) with 32. By published IT capacity: AdaniConneX with 2,033 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in India, including some that do not sell space.
Is there colocation capacity available in India right now?
Coloprice tracks 177 facilities here (123 operational, 54 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in India?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in India
One brief, several operators with capacity in India, same terms. Independent — no operator pays for position.
Colocation in India? One brief, several quotes.
Request quotes →
