STT Jaipur 1
OperationalRIICO Industrial Area, Sitapura, Tonk Road, Jaipur, Rajasthan
STT Jaipur 1 is a data center in Jaipur (Sitapura), India, operated by ST Telemedia Global Data Centres (India), with 6 MW of published IT capacity, currently operational, opened in 2026.
STT GDC's first facility in Rajasthan, marketed as the state's first high-performance data centre, ready for service from June 2026 with dual 33kV utility feeds and up to 10 kW per rack.

- Operator
- ST Telemedia Global Data Centres (India)
- City
- Jaipur (Sitapura), India
- Power, MW
- 6 MW
- Cooling
- Air
- Opened
- 2026
- AI-ready
- Yes
Coloprice Score
28 out of 100
Class E · #40 of 125 in India
- Resilience0/35
- Compliance0/20
- Transparency8/20
- Scale11/15
- Maturity9/10
STT Jaipur 1 is ST Telemedia Global Data Centres' first facility in Rajasthan, sited in the RIICO Industrial Area at Sitapura on Tonk Road, and marketed by the operator as the state's first high-performance data centre. It was ready for service from June 2026 and formally launched in a July 2026 press release, with a design IT load of 6 MW and a total connected power load of up to 10 MVA drawn from dual, diverse and redundant 33kV feeds off the 220kV and 132kV Sitapura substations. The three-storey building is engineered for up to 10 kW per rack without supplemental cooling, a density the operator positions as AI-ready, backed by modular N+N UPS and N+C generator capacity and a target uptime SLA of 99.982%. Floor space is reported inconsistently between the operator's own pages — 95,300 sq ft on the locations page versus 5,971 sqm across three storeys in the launch release — likely a built-up-versus-usable-area distinction rather than a factual error, but neither figure has been reconciled publicly. As STT GDC's entry point into a new Indian state, Jaipur 1 extends the operator's national footprint beyond its established metro clusters.
- ▮STT GDC's first Rajasthan facility, marketed as the state's first high-performance data centre
- ▮Ready for service June 2026; design IT load 6 MW, up to 10 MVA total connected power
- ▮Dual, diverse and redundant 33kV feeds from 220kV/132kV Sitapura substations
- ▮Up to 10 kW per rack without supplemental cooling; modular N+N UPS, N+C generators
- ▮Target uptime SLA of 99.982%
Colocation pricing: India & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification