▮▮Coloprice

STT Jaipur 1

Operational

RIICO Industrial Area, Sitapura, Tonk Road, Jaipur, Rajasthan

STT Jaipur 1 is a data center in Jaipur (Sitapura), India, operated by ST Telemedia Global Data Centres (India), with 6 MW of published IT capacity, currently operational, opened in 2026.

STT GDC's first facility in Rajasthan, marketed as the state's first high-performance data centre, ready for service from June 2026 with dual 33kV utility feeds and up to 10 kW per rack.

STT Jaipur 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
ST Telemedia Global Data Centres (India)
City
Jaipur (Sitapura), India
Power, MW
6 MW
Cooling
Air
Opened
2026
AI-ready
Yes
E

Coloprice Score

28 out of 100

Class E · #40 of 125 in India

  • Resilience0/35
  • Compliance0/20
  • Transparency8/20
  • Scale11/15
  • Maturity9/10
How the score is calculated →
Embed score badge
STT Jaipur 1 — Coloprice Score 28
<a href="https://coloprice.com/data-centers/india/jaipur/stt-gdc-jaipur-1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/stt-gdc-jaipur-1.svg"
    alt="STT Jaipur 1 — Coloprice Score 28" height="64">
</a>

STT Jaipur 1 is ST Telemedia Global Data Centres' first facility in Rajasthan, sited in the RIICO Industrial Area at Sitapura on Tonk Road, and marketed by the operator as the state's first high-performance data centre. It was ready for service from June 2026 and formally launched in a July 2026 press release, with a design IT load of 6 MW and a total connected power load of up to 10 MVA drawn from dual, diverse and redundant 33kV feeds off the 220kV and 132kV Sitapura substations. The three-storey building is engineered for up to 10 kW per rack without supplemental cooling, a density the operator positions as AI-ready, backed by modular N+N UPS and N+C generator capacity and a target uptime SLA of 99.982%. Floor space is reported inconsistently between the operator's own pages — 95,300 sq ft on the locations page versus 5,971 sqm across three storeys in the launch release — likely a built-up-versus-usable-area distinction rather than a factual error, but neither figure has been reconciled publicly. As STT GDC's entry point into a new Indian state, Jaipur 1 extends the operator's national footprint beyond its established metro clusters.

  • STT GDC's first Rajasthan facility, marketed as the state's first high-performance data centre
  • Ready for service June 2026; design IT load 6 MW, up to 10 MVA total connected power
  • Dual, diverse and redundant 33kV feeds from 220kV/132kV Sitapura substations
  • Up to 10 kW per rack without supplemental cooling; modular N+N UPS, N+C generators
  • Target uptime SLA of 99.982%

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification