Digital Edge CGK Campus

Under construction

GIIC Industrial Estate, Bekasi, West Java

Digital Edge CGK Campus is a data center in Jakarta (Bekasi), Indonesia, operated by Digital Edge, with 500 MW of published IT capacity, currently under construction.

US$4.5 billion, 500 MW AI-ready hyperscale campus under construction at GIIC Industrial Estate in Bekasi, scalable to 1 GW, with the first building due Q4 2026.

Digital Edge CGK Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Digital Edge
City
Jakarta (Bekasi), Indonesia
Power, MW
500 MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

24 out of 100

limited data · #14 of 28 in Indonesia

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Digital Edge CGK Campus — Coloprice Score 24
<a href="https://coloprice.com/data-centers/indonesia/jakarta/digital-edge-cgk-campus-bekasi/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/digital-edge-cgk-campus-bekasi.svg"
    alt="Digital Edge CGK Campus — Coloprice Score 24" height="64">
</a>

Connectivity: 1 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

Digital Edge announced on January 28, 2026 a US$4.5 billion investment to build the CGK Campus, an AI-ready hyperscale data center site at the GIIC Industrial Estate in Bekasi, roughly 40 km from the operator's existing downtown EDGE1 and EDGE2 facilities in central Jakarta. The campus is designed for 500 MW of IT capacity with headroom to scale to 1 GW, making it one of the largest single-site data center commitments announced in Indonesia to date. Digital Edge is building the first phase across three buildings, with ready-for-service dates staggered through Q4 2026, Q1 2027 and Q2 2027. Engineering targets an annualized PUE of 1.25 using direct-to-chip liquid cooling alongside recycled-water systems and renewable energy integration, positioning the site for dense GPU deployments rather than conventional enterprise colocation. Connectivity runs through Indonet, Digital Edge's wholly owned Indonesian telecom subsidiary, over fully underground fiber routes designed to improve resilience versus aerial cable common elsewhere in the market. The Bekasi site adds to a wave of hyperscale campuses forming around Greater Jakarta as operators look past land- and power-constrained central Jakarta for AI-scale capacity.

  • US$4.5 billion investment announced January 28, 2026; largest single Digital Edge commitment to date
  • 500 MW design capacity, scalable to 1 GW at GIIC Industrial Estate, Bekasi
  • First of three phase-one buildings targets Q4 2026 ready-for-service
  • Direct-to-chip liquid cooling, target annualized PUE of 1.25
  • Connectivity via Indonet's fully underground fiber routes

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Jakarta (Bekasi)