Digital Edge CGK Campus
Under constructionGIIC Industrial Estate, Bekasi, West Java
Digital Edge CGK Campus is a data center in Jakarta (Bekasi), Indonesia, operated by Digital Edge, with 500 MW of published IT capacity, currently under construction.
US$4.5 billion, 500 MW AI-ready hyperscale campus under construction at GIIC Industrial Estate in Bekasi, scalable to 1 GW, with the first building due Q4 2026.

- Operator
- Digital Edge
- City
- Jakarta (Bekasi), Indonesia
- Power, MW
- 500 MW
- Cooling
- Liquid
- AI-ready
- Yes
Coloprice Score
24 out of 100
limited data · #14 of 28 in Indonesia
- Resilience0/35
- Compliance0/20
- Transparency6/20
- Scale15/15
- Maturity3/10
Connectivity: 1 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →
Digital Edge announced on January 28, 2026 a US$4.5 billion investment to build the CGK Campus, an AI-ready hyperscale data center site at the GIIC Industrial Estate in Bekasi, roughly 40 km from the operator's existing downtown EDGE1 and EDGE2 facilities in central Jakarta. The campus is designed for 500 MW of IT capacity with headroom to scale to 1 GW, making it one of the largest single-site data center commitments announced in Indonesia to date. Digital Edge is building the first phase across three buildings, with ready-for-service dates staggered through Q4 2026, Q1 2027 and Q2 2027. Engineering targets an annualized PUE of 1.25 using direct-to-chip liquid cooling alongside recycled-water systems and renewable energy integration, positioning the site for dense GPU deployments rather than conventional enterprise colocation. Connectivity runs through Indonet, Digital Edge's wholly owned Indonesian telecom subsidiary, over fully underground fiber routes designed to improve resilience versus aerial cable common elsewhere in the market. The Bekasi site adds to a wave of hyperscale campuses forming around Greater Jakarta as operators look past land- and power-constrained central Jakarta for AI-scale capacity.
- ▮US$4.5 billion investment announced January 28, 2026; largest single Digital Edge commitment to date
- ▮500 MW design capacity, scalable to 1 GW at GIIC Industrial Estate, Bekasi
- ▮First of three phase-one buildings targets Q4 2026 ready-for-service
- ▮Direct-to-chip liquid cooling, target annualized PUE of 1.25
- ▮Connectivity via Indonet's fully underground fiber routes
Colocation pricing: Indonesia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Jakarta (Bekasi)
Source — Verified against operator sources · data pending on-site verification