▮▮Coloprice

Digital Edge colocation provider: facilities and services

Coloprice tracks 16 Digital Edge facilities across 5 countries (Japan, Philippines, South Korea, Indonesia, India) and 9 cities. 13 of 16 publish IT capacity — 687 MW combined; the rest do not disclose power.

By status: 13 operational · 3 under construction. Certifications reported across these facilities include ISO 14001, ISO 27001, ISO 45001, Uptime Institute Tier III Certification of Design Documents, ANSI/TIA-942-C Facility - Rated 3, BERDE.

Build a site-specific Digital Edge colocation brief

Digital Edge markets data centers, colocation and interconnection across Asia Pacific. Use the source-linked facility records below to identify the actual location and operating phase. A platform-wide service description is not confirmation that the same service, capacity or certification is available at every building.

For a cabinet, cage or larger deployment, specify the required space, committed IT power, sustained rack density, cooling and target delivery date. Ask whether connectivity is delivered within the building or depends on an additional carrier service. Obtain the available cross-connect options, setup costs and support responsibilities in writing.

Compare the proposed Digital Edge site with alternatives on one commercial schedule: space, power, energy, connectivity, installation, remote hands and annual escalation. The directory distinguishes operational records from development-stage capacity; a planned campus should not be scored as immediately deliverable space.

Digital Edge: products and services

What does Digital Edge offer as a colocation provider?

Its published service portfolio includes data centers, colocation and interconnection. Confirm the exact space, power, cooling, connectivity and support scope for the specific facility in your proposal.

Are Digital Edge colocation prices published here?

The directory does not establish a universal tariff. Obtain a current itemized proposal for the required site, workload and term.

Does a Digital Edge campus announcement mean space is ready?

No. Check the operating phase, commissioning evidence, available IT power and contractual delivery date separately from the announced campus scale.

Key facts

Facilities
16
Countries
Japan, Philippines, South Korea, Indonesia, India
Cities
9
Published capacity
687 MW (13 of 16 facilities publish MW)
Status
13 operational · 3 under construction
Certifications
ISO 14001, ISO 27001, ISO 45001, Uptime Institute Tier III Certification of Design Documents, ANSI/TIA-942-C Facility - Rated 3, BERDE
Website
digitaledgedc.com
Sources
Digital Edge — TYO2 Tokyo Data Center · Digital Edge — NARRA1 Manila Data Center · Digital Edge press release — first Philippines data center

Figures are aggregated from the facility cards below. Capacity is summed only where the operator publishes MW, so totals are floors, not estimates.

Coloprice Score of Digital Edge

Average score
31 out of 100 across 16 facilities
Best facility
Digital Edge EDGE2 · 60C
Class distribution
C 1D 7E 3limited data 5

Each facility is scored on its own from published, source-cited data; the operator figure is a plain average. How the score is calculated.

Digital Edge facilities in the catalog

Japan (7)

FacilityLocationMWScoreStatus
Digital Edge TYO2Tokyo, Japan—36DOperational
Digital Edge TYO1Tokyo, Japan3.7637DOperational
Digital Edge TYO3Tokyo, Japan3.927EOperational
Digital Edge TYO7Tokyo, Japan4.823EUnder construction
Digital Edge OSA1Osaka, Japan14.440DOperational
Digital Edge TYO4/5/6Yokohama, Japan18.525·Operational
Digital Edge OSA2Osaka, Japan—7·Operational

Philippines (1)

FacilityLocationMWScoreStatus
Digital Edge NARRA1Greater Manila (Biñan, Laguna), Philippines1045DOperational

South Korea (4)

FacilityLocationMWScoreStatus
Digital Edge SEL2Incheon, South Korea3631EOperational
Digital Edge SEL1Seoul, South Korea2.436DOperational
Digital Edge PUS1Busan, South Korea4.537DOperational
Digital Edge SEL3Incheon, South Korea6020·Under construction

Indonesia (3)

FacilityLocationMWScoreStatus
Digital Edge CGK CampusJakarta (Bekasi), Indonesia50024·Under construction
Digital Edge EDGE1Jakarta (Kuningan, South Jakarta), Indonesia644DOperational
Digital Edge EDGE2Jakarta (Kuningan Mulia, South Jakarta), Indonesia2360COperational

India (1)

FacilityLocationMWScoreStatus
Digital Edge BOM1Navi Mumbai, India—11·Operational

Operator vs operator

Digital Edge vs KT CloudDigital Edge vs Samsung SDSDigital Edge vs SK Broadband

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

All reviews →

← All operators · ← All facilities

Operate these facilities? Claim the profile — free data check and badges →

Represent Digital Edge? Claim and verify these listings — corrections ship within a week.

Claim listings