STT Jakarta 2 is a data center in Jakarta (Cikarang), Indonesia, operated by ST Telemedia Global Data Centres (STT GDC), with 24 MW of published IT capacity, currently operational.
24 MW second facility on STT GDC's Kota Deltamas campus in Cikarang, launched June 2026 as part of a 360 MW+ AI-ready pipeline backed by Indonesia's first on-site high-voltage substation built for a data center.

- Operator
- ST Telemedia Global Data Centres (STT GDC)
- City
- Jakarta (Cikarang), Indonesia
- Power, MW
- 24 MW
- Cooling
- Air
- AI-ready
- Yes
Coloprice Score
35 out of 100
Class D · #6 of 28 in Indonesia
- Resilience0/35
- Compliance9/20
- Transparency6/20
- Scale13/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
STT Jakarta 2 is the second facility on ST Telemedia Global Data Centres' Kota Deltamas campus in Cikarang, part of Greater Jakarta, and began commercial operations in June 2026 with 24 MW of IT load. The building is engineered for high-density, AI-ready deployments, with a design PUE below 1.30 and cooling infrastructure built to support next-generation NVIDIA platforms including Vera Rubin and Vera Rubin Ultra, giving tenants a path to liquid cooling without a separate retrofit. STT GDC paired the launch with the topping-out of the neighboring STT Jakarta 3 building and groundbreaking on STT Jakarta 5 and 6 — two further 40 MW facilities — taking the campus toward a combined pipeline of more than 360 MW. The campus runs on Indonesia's first on-site high-voltage substation built specifically for a data center, part of a renewable-energy strategy developed with state utility PLN aimed at carbon-neutral operation from day one. STT Jakarta 2 carries ISO 27001 and PCI DSS certification and is financed in part through STT GDC's first green loan tranche in Indonesia, reflecting the sustainability requirements increasingly attached to hyperscale debt in the region.
- ▮24 MW IT load, commenced operations June 2026
- ▮Design PUE <1.30, liquid-cooling-ready for NVIDIA Vera Rubin platforms
- ▮Part of 360 MW+ Kota Deltamas campus pipeline (STT Jakarta 2/3/5/6)
- ▮Indonesia's first on-site high-voltage substation built for a data center campus
- ▮ISO 27001, PCI DSS certified; financed via STT GDC's first Indonesia green loan tranche
Colocation pricing: Indonesia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Jakarta (Cikarang)
Source — Verified against operator sources · data pending on-site verification