Vantage Dublin Campus (DUB1)

Under construction

Profile Park, Grange Castle, Dublin 22

Vantage Dublin Campus (DUB1) is a data center in Dublin, Ireland, operated by Vantage Data Centers, with 52 MW of published IT capacity, currently under construction.

Vantage's first Dublin campus of 405,000 sq ft comprising a 32 MW and a 20 MW facility, featuring a next-generation on-site energy solution.

Vantage Dublin Campus (DUB1) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Vantage Data Centers
City
Dublin, Ireland
Power, MW
52 MW
Cooling
Air
Floor space
38,000 m²
E

Coloprice Score

23 out of 100

Class E · #19 of 26 in Ireland

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Vantage Dublin Campus (DUB1) — Coloprice Score 23
<a href="https://coloprice.com/data-centers/ireland/dublin/vantage-dub1-dublin/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/vantage-dub1-dublin.svg"
    alt="Vantage Dublin Campus (DUB1) — Coloprice Score 23" height="64">
</a>

Vantage Data Centers entered the Irish market in April 2024 with DUB1, a 52MW campus at Profile Park in Grange Castle, about 15km from Dublin city centre in the metro's main hyperscale corridor. The 22-acre site carries two two-storey facilities of 32MW and 20MW totalling 405,000 sq ft (38,000 sq m), with land and power reserved for a third building. Its answer to Dublin's grid moratorium is an on-site 100 MVA multi-fuel generation plant running primarily hydrotreated vegetable oil with gas from Gas Networks Ireland, delivering N+1 redundancy and the ability to export power back to the grid. Cooling uses a closed-loop chilled-water system with air-cooled chillers and economisers, achieving near-zero water usage and N+2 mechanical redundancy, at an average design density of 300W per sq ft. Four points of entry, diverse fibre paths and multiple meet-me rooms keep the campus carrier-neutral. Representing over 1 billion euro of investment targeting a 1.2 annual PUE, DUB1 is built for hyperscale and large cloud deployments.

  • 52MW campus at Profile Park, Grange Castle: 32MW and 20MW facilities across 405,000 sq ft
  • On-site 100 MVA multi-fuel plant (HVO plus gas) bypasses Dublin grid constraints, N+1 redundant
  • Closed-loop chilled-water cooling with near-zero water usage; N+2 mechanical redundancy
  • Average design density of 300W/sq ft; annual PUE target of 1.2
  • Carrier-neutral with four points of entry and multiple meet-me rooms; first phase targeted late 2024

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Dublin

Source — Verified against operator sources · data pending on-site verification