Vantage Dublin Campus (DUB1)
Under constructionProfile Park, Grange Castle, Dublin 22
Vantage Dublin Campus (DUB1) is a data center in Dublin, Ireland, operated by Vantage Data Centers, with 52 MW of published IT capacity, currently under construction.
Vantage's first Dublin campus of 405,000 sq ft comprising a 32 MW and a 20 MW facility, featuring a next-generation on-site energy solution.

- Operator
- Vantage Data Centers
- City
- Dublin, Ireland
- Power, MW
- 52 MW
- Cooling
- Air
- Floor space
- 38,000 m²
Coloprice Score
23 out of 100
Class E · #19 of 26 in Ireland
- Resilience0/35
- Compliance0/20
- Transparency9/20
- Scale11/15
- Maturity3/10
Vantage Data Centers entered the Irish market in April 2024 with DUB1, a 52MW campus at Profile Park in Grange Castle, about 15km from Dublin city centre in the metro's main hyperscale corridor. The 22-acre site carries two two-storey facilities of 32MW and 20MW totalling 405,000 sq ft (38,000 sq m), with land and power reserved for a third building. Its answer to Dublin's grid moratorium is an on-site 100 MVA multi-fuel generation plant running primarily hydrotreated vegetable oil with gas from Gas Networks Ireland, delivering N+1 redundancy and the ability to export power back to the grid. Cooling uses a closed-loop chilled-water system with air-cooled chillers and economisers, achieving near-zero water usage and N+2 mechanical redundancy, at an average design density of 300W per sq ft. Four points of entry, diverse fibre paths and multiple meet-me rooms keep the campus carrier-neutral. Representing over 1 billion euro of investment targeting a 1.2 annual PUE, DUB1 is built for hyperscale and large cloud deployments.
- ▮52MW campus at Profile Park, Grange Castle: 32MW and 20MW facilities across 405,000 sq ft
- ▮On-site 100 MVA multi-fuel plant (HVO plus gas) bypasses Dublin grid constraints, N+1 redundant
- ▮Closed-loop chilled-water cooling with near-zero water usage; N+2 mechanical redundancy
- ▮Average design density of 300W/sq ft; annual PUE target of 1.2
- ▮Carrier-neutral with four points of entry and multiple meet-me rooms; first phase targeted late 2024
Colocation pricing: Ireland & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Dublin
Source — Verified against operator sources · data pending on-site verification