▮▮Coloprice

CyrusOne MIL2

Under construction

Via Raffaele Rubattino 90, 20134 Milan

CyrusOne MIL2 is a data center in Milan, Italy, operated by CyrusOne, with 54 MW of published IT capacity, currently under construction.

CyrusOne's largest data center under development in Italy, at Via Raffaele Rubattino in Milan, planned for 54 MW of IT capacity across 18,000 sqm of technical space.

CyrusOne MIL2 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
CyrusOne
City
Milan, Italy
Power, MW
54 MW
Cooling
Air
Floor space
18,000 m²
Renewable energy
100%
E

Coloprice Score

26 out of 100

Class E · #6 of 24 in Italy

  • Resilience0/35
  • Compliance0/20
  • Transparency12/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
CyrusOne MIL2 — Coloprice Score 26
<a href="https://coloprice.com/data-centers/italy/milan/cyrusone-mil2-milan/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/cyrusone-mil2-milan.svg"
    alt="CyrusOne MIL2 — Coloprice Score 26" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

CyrusOne MIL2 — Top 10 data centers in Italy 2026
#6 of 24 · See the list →
CyrusOne MIL2 — Top 10 data centers in Milan, Italy 2026
#5 of 20 · See the list →

CyrusOne's MIL2 is under development at Via Raffaele Rubattino 90 in Milan, and at a planned 54 MW of IT capacity it is the larger of the operator's two Milan sites (the other, MIL1, is a separate campus in Segrate). The single building spans three floors and 18,000 sqm of technical space. Cooling is designed around free-cooling technology tuned to ASHRAE standards with closed-loop water systems to hold down PUE and WUE. CyrusOne states the design targets BREEAM "Very Good" along with ISO 14001 and ISO 50001 management-system certification once operational. Sustainability commitments include more than 500 sqm of solar panels, a heat-reuse-ready design, 100% renewable electricity and an offer to hand roughly 30% of the site to the municipality. No opening date has been published for MIL2 itself, unlike MIL1's stated Q3 2027 first-phase target.

  • 54 MW IT capacity planned; CyrusOne's larger Milan site
  • 18,000 sqm technical space across three floors
  • BREEAM "Very Good" (target); ISO 14001 and ISO 50001 (target)
  • 100% renewable electricity; heat-reuse-ready design
  • Second of two separate CyrusOne campuses in Milan

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Milan

Source — Verified against operator sources · data pending on-site verification