Ishikari Renewable Energy Data Center #1

Operational

Ishikari City, Hokkaido, Japan

Ishikari Renewable Energy Data Center #1 is a data center in Ishikari (Hokkaido), Japan, operated by Tokyu Land Corporation, with 15 MW of published IT capacity, currently operational.

15 MW data center in Ishikari, Hokkaido, completed in March 2026 and run on 100% renewable power, with partial data-hall operations starting in August 2026.

Ishikari Renewable Energy Data Center #1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Tokyu Land Corporation
City
Ishikari (Hokkaido), Japan
Power, MW
15 MW
Cooling
Air

Coloprice Score

24 out of 100

limited data · #40 of 68 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Ishikari Renewable Energy Data Center #1 — Coloprice Score 24
<a href="https://coloprice.com/data-centers/japan/ishikari/tokyu-land-ishikari-re-dc1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/tokyu-land-ishikari-re-dc1.svg"
    alt="Ishikari Renewable Energy Data Center #1 — Coloprice Score 24" height="64">
</a>

Tokyu Land's first Hokkaido data center leans entirely on the region's cold climate and renewable generation instead of grid decarbonization promises. Completed on 27 March 2026 in Ishikari City, north of Sapporo, the roughly 11,000 sqm building houses about 1,140 racks behind a 15 MW power receiving capacity, with select data halls starting partial operations in August 2026. Power comes from a dedicated 2 MW on-site plant plus 673 kW of rooftop solar within a purpose-built 'RE Zone,' connected to tenant halls over a private line so IT load can be matched against verifiable renewable generation rather than certificates alone. The project anchors a newly formed Ishikari Data Center Consortium that groups Tokyu Land with NTT East, Sakura Internet, Kyocera and several regional energy and telecom operators, aiming to turn Ishikari Bay New Port — an area with abundant renewable capacity and low seismic and flood risk — into a national-scale data center cluster. The site targets enterprise and cloud tenants seeking verifiably green capacity outside Tokyo's power-constrained metro.

  • 15 MW power receiving capacity, ~1,140 racks, ~11,000 sqm floor area
  • Completed March 2026; partial data-hall operations from August 2026
  • 100% renewable power via on-site 2 MW plant and 673 kW solar, delivered over a private line
  • Anchors the new Ishikari Data Center Consortium with NTT East and Sakura Internet

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification