2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Ishikari: 2 facilities, colocation pricing
How many data centers are in Ishikari?
Coloprice tracks 2 data centers in Ishikari, Japan: 2 operational, 0 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.185
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 15+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Ishikari (Hokkaido), Japan | · · · | $0.185 | 2 | — |
| South Korea | · · · | $0.118 | 59 | — |
| Singapore | $403 | $0.270 | 60 | — |
| United States | $196 | $0.117 | 1332 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Ishikari?
Coloprice tracks 2 data centers in Ishikari, Japan: 2 operational, 0 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Ishikari?
By number of facilities tracked: Tokyu Land Corporation (1), Sakura Internet (1).
What is the total data center power capacity in Ishikari?
Facilities that publish capacity add up to 15 MW (1 of 2 sites disclose a figure); the largest published site is Ishikari Renewable Energy Data Center #1 with 15 MW.
How much does colocation cost in Ishikari (Hokkaido), Japan?
No published wholesale $/kW benchmark exists for Ishikari (Hokkaido), Japan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Ishikari (Hokkaido), Japan?
Commercial electricity in Ishikari (Hokkaido), Japan is $0.185 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Ishikari (Hokkaido), Japan?
On power alone, South Korea ($0.118/kWh), United States ($0.117/kWh) run below Ishikari (Hokkaido), Japan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Ishikari (Hokkaido), Japan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Ishikari Renewable Energy Data Center #1 | Tokyu Land Corporation | 15 | — | Operational |
| Sakura Internet Ishikari Data Center | Sakura Internet | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Ishikari: free, reply within one business day
Get Quotes →