▮▮Coloprice

NTT Keihanna OSK11 Data Center

Operational

NTT Keihanna OSK11 Data Center is a data center in Seika (Kyoto Prefecture), Japan, operated by NTT Global Data Centers, with 30 MW of published IT capacity, currently operational, opened in 2026.

NTT DATA's 14th data center in Japan, opened April 2026 in the Keihanna Science City area between Osaka, Kyoto and Nara, marketed as AI-ready.

NTT Keihanna OSK11 Data Center — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
NTT Global Data Centers
City
Seika (Kyoto Prefecture), Japan
Power, MW
30 MW
Cooling
Air
Opened
2026
Floor space
10,900 m²
AI-ready
Yes
E

Coloprice Score

31 out of 100

Class E · #26 of 68 in Japan

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity9/10
How the score is calculated →
Embed score badge
NTT Keihanna OSK11 Data Center — Coloprice Score 31
<a href="https://coloprice.com/data-centers/japan/seika/ntt-keihanna-osk11-seika/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ntt-keihanna-osk11-seika.svg"
    alt="NTT Keihanna OSK11 Data Center — Coloprice Score 31" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

NTT Keihanna OSK11 Data Center — Best data center in Seika (Kyoto Prefecture), Japan 2026
#1 of 3 · See the list →

NTT Keihanna OSK11 opened on April 9, 2026 in the Keihanna Science City area of the Osaka–Kyoto–Nara corridor (Sōraku District, Kyoto Prefecture), and is NTT DATA's 14th data center in Japan by the operator's own count. The facility provides about 10,900 sqm of server-room space and 30 MW of IT load, fed by dual power substations on diversified paths with N+1 air-cooled chiller cooling. NTT markets the site with AI-ready design language and a 24/7 security operations center using multi-factor access control, positioning it as capacity for the AI and cloud workloads driving new demand in the Kansai region outside central Osaka. No street address, certifications or renewable-energy percentage are published for the site; NTT's two other disclosed Japan facilities, Osaka OSK12 and Tokyo 11, remain the operator's only other publicly documented sites in the country.

  • Opened April 9, 2026 — NTT DATA's 14th data center in Japan
  • ~10,900 sqm server-room space, 30 MW IT load
  • Dual substations on diversified paths, N+1 air-cooled chiller cooling
  • Marketed as AI-ready; located in the Keihanna Science City area between Osaka, Kyoto and Nara

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Seika (Kyoto Prefecture)

Source — Verified against operator sources · data pending on-site verification