▮▮Coloprice
← Japan

3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Seika (Kyoto Prefecture): 3 facilities, colocation pricing

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.201

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 147+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Seika (Kyoto Prefecture), Japan· · ·$0.2013
South Korea· · ·$0.11813
Singapore$403$0.27033
United States$196$0.109574

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How much does colocation cost in Seika (Kyoto Prefecture), Japan?

No published wholesale $/kW benchmark exists for Seika (Kyoto Prefecture), Japan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Seika (Kyoto Prefecture), Japan?

Commercial electricity in Seika (Kyoto Prefecture), Japan is $0.201 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Seika (Kyoto Prefecture), Japan?

On power alone, South Korea ($0.118/kWh), United States ($0.109/kWh) run below Seika (Kyoto Prefecture), Japan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Seika (Kyoto Prefecture), Japan market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
NTT Keihanna OSK11 Data CenterNTT Global Data Centers30Operational
STACK KIX01STACK Infrastructure72Under construction
Colt Osaka Keihanna Data CentreColt DCS45Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.