EdgeConneX Bukit Jalil

Under construction

MRANTI Park, Bukit Jalil, Kuala Lumpur, Malaysia

EdgeConneX Bukit Jalil is a data center in Kuala Lumpur, Malaysia, operated by EdgeConneX, with 70 MW of published IT capacity, currently under construction.

Greenfield EdgeConneX build in the MRANTI technology park at Bukit Jalil with nearly 70 MW of IT load for hyperscale, cloud and AI deployments.

EdgeConneX Bukit Jalil — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
EdgeConneX
City
Kuala Lumpur, Malaysia
Power, MW
70 MW
Cooling
Air
Floor space
60,000 m²
Max density
20 kW/rack
AI-ready
Yes
E

Coloprice Score

28 out of 100

Class E · #19 of 64 in Malaysia

  • Resilience0/35
  • Compliance0/20
  • Transparency12/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
EdgeConneX Bukit Jalil — Coloprice Score 28
<a href="https://coloprice.com/data-centers/malaysia/kuala-lumpur/edgeconnex-bukit-jalil/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/edgeconnex-bukit-jalil.svg"
    alt="EdgeConneX Bukit Jalil — Coloprice Score 28" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

EdgeConneX Bukit Jalil — Top 25 data centers in Malaysia 2026
#19 of 64 · See the list →
EdgeConneX Bukit Jalil — Top 3 data centers in Kuala Lumpur, Malaysia 2026
#3 of 10 · See the list →

The Bukit Jalil site is the hyperscale centerpiece of EdgeConneX's near-US$2 billion Malaysia programme: a greenfield build inside MRANTI Park, Kuala Lumpur's technology and innovation district, about 12 km from the operator's planned CBD facility and 16 km from its Cyberjaya campus. EdgeConneX lists 22.4 MW of current capacity with expansion headroom to 67 MW (marketed as nearly 70 MW of IT load), served by a dedicated 132 kV substation and roughly 60,000 sqm of space. Like the operator's other Malaysian builds, the facility uses an N+1 chilled-water cooling system with separate fan-wall and CRAH units and supports densities up to 20 kW per cabinet, positioning it for large cloud and AI deployments rather than retail colocation. Power delivery is concurrently maintainable in at least an N+1 configuration, and the carrier-neutral design provides diverse fibre conduits into multiple meet-me rooms. Compliance targets include SOC 2 Type 2, PCI DSS, and ISO 27001, and EdgeConneX is working with the Malaysian government and utility TNB on renewable supply, with waterless cooling and low PUE among the stated design considerations.

  • Greenfield build in MRANTI Park, Bukit Jalil, Kuala Lumpur
  • 22.4 MW current capacity, expandable to 67 MW (nearly 70 MW IT load)
  • Dedicated 132 kV substation; ~60,000 sqm of space
  • N+1 chilled-water cooling, up to 20 kW per cabinet
  • Part of EdgeConneX's ~300 MW, ~US$2 billion Malaysia programme

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Kuala Lumpur

Source — Verified against operator sources · data pending on-site verification