2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Skopje: 2 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.304
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Skopje, North Macedonia | · · · | $0.304 | 2 | — |
| Greece | · · · | $0.221 | 11 | — |
| Bulgaria | · · · | $0.396 | 2 | — |
| Serbia | · · · | $0.155 | 2 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Skopje, North Macedonia?
No published wholesale $/kW benchmark exists for Skopje, North Macedonia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Skopje, North Macedonia?
Commercial electricity in Skopje, North Macedonia is $0.304 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Skopje, North Macedonia?
On power alone, Greece ($0.221/kWh), Serbia ($0.155/kWh) run below Skopje, North Macedonia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Skopje, North Macedonia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| neoDC | Neocom A.D. Skopje | — | — | Operational |
| Interspace Data Center | Interspace | — | — | Operational |