▮▮Coloprice
← Poland

8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Poznań: 8 facilities, colocation pricing

Colocation pricing and providers in Poznań →

How many data centers are in Poznań?

Coloprice tracks 8 data centers in Poznań, Poland: 8 operational, 0 under construction and 0 announced, run by 6 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.177

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 1 AI-ready · 44+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Poznań, Poland· · ·$0.1778—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Poznań?

Coloprice tracks 8 data centers in Poznań, Poland: 8 operational, 0 under construction and 0 announced, run by 6 operators.

Which operators run data centers in Poznań?

By number of facilities tracked: Beyond.pl (3), Talex S.A. (1), Orange Polska (1), Horyzont Technologie Internetowe sp.z.o.o. (1), Poznan Supercomputing and Networking Center (1).

What is the total data center power capacity in Poznań?

Facilities that publish capacity add up to 44 MW (2 of 8 sites disclose a figure); the largest published site is Beyond.pl Data Center 2 with 42 MW.

How much does colocation cost in Poznań, Poland?

No published wholesale $/kW benchmark exists for Poznań, Poland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Poznań, Poland?

Commercial electricity in Poznań, Poland is $0.177 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Poznań, Poland?

Poznań, Poland sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Poznań, Poland market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Poznań vs WarsawPoznań vs WrocławKatowice vs Poznań

Data centers

FacilityOperatorPower, MWTierStatus
Beyond.pl Data Center 1Beyond.pl1.8—Operational
Beyond.pl Data Center 2Beyond.pl424Operational
Talex Data Center PoznańTalex S.A.——Operational
Orange Polska // PoznańOrange Polska——Operational
Poznań City StadiumHoryzont Technologie Internetowe sp.z.o.o.——Operational
Poznan Supercomputing and Networking CenterPoznan Supercomputing and Networking Center——Operational
Beyond.pl - DC1 / PoznanBeyond.pl——Operational
Netia Poznań (POZNH003)Netia——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.