6 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Katowice: 6 facilities, colocation pricing
Colocation pricing and providers in Katowice →
How many data centers are in Katowice?
Coloprice tracks 6 data centers in Katowice, Poland: 6 operational, 0 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.177
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Katowice, Poland | · · · | $0.177 | 6 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Katowice?
Coloprice tracks 6 data centers in Katowice, Poland: 6 operational, 0 under construction and 0 announced, run by 6 operators.
Which operators run data centers in Katowice?
By number of facilities tracked: PNT Euro-Centrum (1), PSE Poludnie (1), Atman (1), 3S Data Center (Play/P4) (1), Orange Polska (1).
How much does colocation cost in Katowice, Poland?
No published wholesale $/kW benchmark exists for Katowice, Poland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 6 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Katowice, Poland?
Commercial electricity in Katowice, Poland is $0.177 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 6 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Katowice, Poland?
Katowice, Poland sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Katowice, Poland market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Katowice vs WarsawKatowice vs PoznańKatowice vs Wrocław
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Euro-Centrum Katowice Data Center | PNT Euro-Centrum | — | III | Operational |
| PSE Jordana | PSE Poludnie | — | — | Operational |
| ATMAN Data Center Katowice-1 (KTW-1, Altus) | Atman | — | — | Operational |
| 3S Data Center Katowice | 3S Data Center (Play/P4) | — | — | Operational |
| Orange Polska // Katowice | Orange Polska | — | — | Operational |
| 4 Data Center | Quicktel | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Katowice: free, reply within one business day
Get Quotes →