Data Center Colocation Costs in Slovenia: Q3 2026 Price Index

Compare 2 data centers in Slovenia across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

2 facilities2 operators

Colocation pricing: Slovenia & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.193

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Slovenia· · ·$0.1932
Italy· · ·$0.32338
Austria· · ·$0.30213
Croatia· · ·$0.1841

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Slovenia's catalog holds two Ljubljana facilities, both self-declared rather than independently certified: Telemach's colocation data center, described by the operator as designed to Uptime Institute Tier 3 standards with N+1 redundancy (Telemach also runs a smaller site in Maribor), and incumbent Telekom Slovenije's carrier-neutral SDDC, run across three locations nationally and ISO 27001/22301-certified alongside a self-declared Tier 3 design. Neither operator discloses IT power capacity, floor area or rack count for these sites, and no Uptime Institute or TIA-942 award appears on record for either. Business electricity runs $0.193/kWh (GlobalPetrolPrices, Dec 2025), reflecting a generation mix split roughly evenly between nuclear (the Krško plant, co-owned with Croatia), hydro and coal. Slovenia's small, telecom-operator-led market mirrors the pattern seen elsewhere in the Balkans and Central Europe, where incumbents rather than independent colocation specialists still dominate disclosed capacity.

Frequently asked questions

How much does colocation cost in Slovenia?

No published wholesale $/kW benchmark exists for Slovenia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Slovenia?

Commercial electricity in Slovenia is $0.193 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Slovenia?

On power alone, Croatia ($0.184/kWh) run below Slovenia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Slovenia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Slovenia?

Coloprice tracks 2 data centers in Slovenia: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Telemach Data Center LjubljanaTelemach (United Group)SloveniaLjubljana7·Operational
Telekom Slovenije Data Center (SDDC)Telekom Slovenije d.d.SloveniaLjubljana22EOperational