2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Busan: 2 facilities, colocation pricing
How many data centers are in Busan?
Coloprice tracks 2 data centers in Busan, South Korea: 2 operational, 0 under construction and 0 announced, run by 2 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.118
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 5+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Busan (Mieum, Gangseo-gu), South Korea | · · · | $0.118 | 2 | — |
| Japan | $280 | $0.185 | 145 | — |
| Singapore | $403 | $0.270 | 62 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Busan?
Coloprice tracks 2 data centers in Busan, South Korea: 2 operational, 0 under construction and 0 announced, run by 2 operators.
Which operators run data centers in Busan?
By number of facilities tracked: LG CNS (1), Digital Edge (1).
What is the total data center power capacity in Busan?
Facilities that publish capacity add up to 5 MW (1 of 2 sites disclose a figure); the largest published site is Digital Edge PUS1 with 4.5 MW.
How much does colocation cost in Busan (Mieum, Gangseo-gu), South Korea?
No published wholesale $/kW benchmark exists for Busan (Mieum, Gangseo-gu), South Korea yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Busan (Mieum, Gangseo-gu), South Korea?
Commercial electricity in Busan (Mieum, Gangseo-gu), South Korea is $0.118 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Busan (Mieum, Gangseo-gu), South Korea?
Busan (Mieum, Gangseo-gu), South Korea sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Busan (Mieum, Gangseo-gu), South Korea market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| LG CNS Busan Global Cloud Data Center | LG CNS | — | — | Operational |
| Digital Edge PUS1 | Digital Edge | 4.5 | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Busan: free, reply within one business day
Get Quotes →