Digital Edge SEL2

Operational

Bupyeong-gu, Incheon, South Korea

Digital Edge SEL2 is a data center in Incheon, South Korea, operated by Digital Edge, with 36 MW of published IT capacity, currently operational.

36 MW AI-ready first phase of a 100+ MW campus in Bupyeong-gu, Incheon — South Korea's largest planned commercial colocation campus — live since October 2024, supporting up to 130 kW per cabinet with liquid cooling.

Digital Edge SEL2 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation
Operator
Digital Edge
City
Incheon, South Korea
Power, MW
36 MW
Cooling
Liquid
Max density
130 kW/rack
AI-ready
Yes
E

Coloprice Score

31 out of 100

Class E · #11 of 38 in South Korea

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale15/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Digital Edge SEL2 — Coloprice Score 31
<a href="https://coloprice.com/data-centers/south-korea/incheon/digital-edge-sel2-incheon/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/digital-edge-sel2-incheon.svg"
    alt="Digital Edge SEL2 — Coloprice Score 31" height="64">
</a>

Connectivity: 1 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

SEL2 has been in service since October 2024 as the 36 MW first phase of a campus in Bupyeong-gu, Incheon, that Digital Edge says will exceed 100 MW and rank as South Korea's largest commercial colocation campus once fully built out. Developed in partnership with SK Ecoplant, the project is explicitly AI-first: the design supports rack densities up to 130 kW per cabinet using liquid cooling, with an annualized design PUE of 1.25 achieved through engineering that minimizes both energy and water use. The site lies within the Seoul metropolitan area, reaching the capital's business districts via the Seoul–Incheon Expressway, and extends Digital Edge's Korean footprint beyond its SEL1 facility in Gangnam. An anchor tenant was secured ahead of launch. Digital Edge has said planning for a second phase (SEL3) is underway, with construction targeted to begin as the campus grows toward its 100+ MW goal. Digital Edge's standard interconnection stack — Cross Connect, CrossLink and the EPIX internet exchange — is available on-site, aimed at cloud providers and AI platforms running dense GPU clusters.

  • Live since October 2024 — 36 MW first phase of a 100+ MW Incheon campus
  • Up to 130 kW per cabinet with liquid cooling
  • Annualized design PUE of 1.25
  • Developed in partnership with SK Ecoplant
  • Second phase (SEL3) in planning as the campus scales toward 100+ MW

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Incheon

Source — Verified against operator sources · data pending on-site verification