DayOne Chonburi Tech Park (CTP1) is a data center in Chonburi, Thailand, operated by DayOne Data Centers, with 180 MW of published IT capacity, currently under construction.
USD 1 billion hyperscale campus in Amata City Chonburi that broke ground in March 2025 with 180 MW of grid capacity and advanced liquid cooling, expanding toward 300 MW under an MoU with Amata targeting Thailand's first 1 GW power platform.

- Operator
- DayOne Data Centers
- City
- Chonburi, Thailand
- Power, MW
- 180 MW
- Cooling
- Liquid
- Floor space
- 122,000 m²
- AI-ready
- Yes
Coloprice Score
27 out of 100
Class E · #14 of 44 in Thailand
- Resilience0/35
- Compliance0/20
- Transparency9/20
- Scale15/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Ground broke on DayOne's Chonburi Tech Park 1 in March 2025, marking the largest single data-center commitment Thailand had seen to that point: a USD 1 billion hyperscale campus inside the Amata City industrial estate in Chonburi, within the Eastern Economic Corridor southeast of Bangkok. The two-phase development spans roughly 122,000 square meters of floor space and is provisioned with 180 MW of grid capacity, engineered around advanced liquid cooling to handle the rack densities that AI training and high-performance computing demand. The roadmap goes well beyond the initial build: acquisition of 41.3 rai of adjacent land lifts the site's power capacity to 300 MW, and a memorandum with Amata frames CTP1 as the anchor of what the partners intend to become Thailand's first 1 GW power platform, with a future CTP2 to follow. On the energy side, a 42.5 MWp floating-solar plant developed with Amata B.Grimm Renewable Energy is expected online in 2027. The campus is aimed squarely at hyperscalers, cloud platforms, and AI operators needing large contiguous capacity in Thailand.
- ▮USD 1 billion hyperscale campus; ground broken March 2025
- ▮180 MW grid capacity, expanding to 300 MW on enlarged site
- ▮About 122,000 sqm of floor space in two phases
- ▮Advanced liquid cooling designed for AI and HPC densities
- ▮Anchor of a planned 1 GW power platform with Amata; 42.5 MWp floating solar due 2027
Colocation pricing: Thailand & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Chonburi
Source — Verified against operator sources · data pending on-site verification