▮▮Coloprice

DayOne Chonburi Tech Park (CTP1)

Under construction

Amata City Chonburi Industrial Estate, Chonburi, Thailand

DayOne Chonburi Tech Park (CTP1) is a data center in Chonburi, Thailand, operated by DayOne Data Centers, with 180 MW of published IT capacity, currently under construction.

USD 1 billion hyperscale campus in Amata City Chonburi that broke ground in March 2025 with 180 MW of grid capacity and advanced liquid cooling, expanding toward 300 MW under an MoU with Amata targeting Thailand's first 1 GW power platform.

DayOne Chonburi Tech Park (CTP1) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
DayOne Data Centers
City
Chonburi, Thailand
Power, MW
180 MW
Cooling
Liquid
Floor space
122,000 m²
AI-ready
Yes
E

Coloprice Score

27 out of 100

Class E · #14 of 44 in Thailand

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
DayOne Chonburi Tech Park (CTP1) — Coloprice Score 27
<a href="https://coloprice.com/data-centers/thailand/chonburi/dayone-ctp1-chonburi/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/dayone-ctp1-chonburi.svg"
    alt="DayOne Chonburi Tech Park (CTP1) — Coloprice Score 27" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

DayOne Chonburi Tech Park (CTP1) — Top 25 data centers in Thailand 2026
#14 of 44 · See the list →

Ground broke on DayOne's Chonburi Tech Park 1 in March 2025, marking the largest single data-center commitment Thailand had seen to that point: a USD 1 billion hyperscale campus inside the Amata City industrial estate in Chonburi, within the Eastern Economic Corridor southeast of Bangkok. The two-phase development spans roughly 122,000 square meters of floor space and is provisioned with 180 MW of grid capacity, engineered around advanced liquid cooling to handle the rack densities that AI training and high-performance computing demand. The roadmap goes well beyond the initial build: acquisition of 41.3 rai of adjacent land lifts the site's power capacity to 300 MW, and a memorandum with Amata frames CTP1 as the anchor of what the partners intend to become Thailand's first 1 GW power platform, with a future CTP2 to follow. On the energy side, a 42.5 MWp floating-solar plant developed with Amata B.Grimm Renewable Energy is expected online in 2027. The campus is aimed squarely at hyperscalers, cloud platforms, and AI operators needing large contiguous capacity in Thailand.

  • USD 1 billion hyperscale campus; ground broken March 2025
  • 180 MW grid capacity, expanding to 300 MW on enlarged site
  • About 122,000 sqm of floor space in two phases
  • Advanced liquid cooling designed for AI and HPC densities
  • Anchor of a planned 1 GW power platform with Amata; 42.5 MWp floating solar due 2027

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Chonburi

Source — Verified against operator sources · data pending on-site verification