▮▮Coloprice

GSA02 Chonburi Campus

Announced

GSA02 Chonburi Campus is a data center in Chonburi, Thailand, operated by GSA Data Center (Gulf, Singtel Nxera, AIS), announced, not yet built.

Second GSA campus located in Chonburi within the Eastern Economic Corridor, designed as a hyperscale-ready, liquid-cooled, carrier-neutral facility.

GSA02 Chonburi Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · planned
Operator
GSA Data Center (Gulf, Singtel Nxera, AIS)
City
Chonburi, Thailand
Power, MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

4 out of 100

limited data · #42 of 44 in Thailand

  • Resilience0/35
  • Compliance0/20
  • Transparency0/20
  • Scale4/15
  • Maturity0/10
How the score is calculated →
Embed score badge
GSA02 Chonburi Campus — Coloprice Score 4
<a href="https://coloprice.com/data-centers/thailand/chonburi/gsa02-chonburi/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/gsa02-chonburi.svg"
    alt="GSA02 Chonburi Campus — Coloprice Score 4" height="64">
</a>

For its second campus, the Gulf-Singtel Nxera-AIS venture is moving east from the Bangkok metro into Chonburi, inside Thailand's Eastern Economic Corridor. GSA02 is planned at 38 MW with commercial operation targeted for mid-2027, and it inherits the platform blueprint proven at Bang Phli: carrier-neutral interconnection, liquid-cooling architecture engineered for AI, GPU cluster and hyperscale cloud workloads, and renewable energy sourced through Gulf's generation business. The EEC location places the campus near the industrial estates, port infrastructure and government-promoted digital zones of Thailand's eastern seaboard, giving manufacturers and cloud providers in the region an alternative to hauling traffic back to Bangkok. As a project still in development, GSA02 has no published certifications, floor areas or density figures yet; buyers should treat the specification as directional until construction progresses. Its significance is strategic — extending Thailand's first liquid-cooled data centre platform into a second geography and adding EEC capacity to the country's tightening supply.

  • Planned 38 MW campus in Chonburi, Eastern Economic Corridor
  • Commercial operation targeted for mid-2027
  • Second campus of the Gulf / Singtel Nxera / AIS joint venture
  • Liquid-cooled, carrier-neutral design aimed at AI and hyperscale workloads

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Chonburi

Source — Verified against operator sources · data pending on-site verification