▮▮Coloprice
← Thailand

12 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Chonburi: 12 facilities, colocation pricing

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.128

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 3 Tier III/IV · 7 AI-ready · 756+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Chonburi, Thailand· · ·$0.12812
Singapore$403$0.27049
Malaysia· · ·$0.13564
Vietnam· · ·$0.08037

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Chonburi is where the Thai market's generation capacity sits, and the operator list is the tell: alongside NTT, CtrlS and DayOne is the GSA venture of Gulf, Singtel Nxera and AIS — a power producer partnered with carriers. In the Eastern Economic Corridor the scarce input is energised land rather than fibre, so the parties able to secure it are utilities, and they enter data centres as principals instead of suppliers. The catalog records 342 MW across six facilities, four still in the pipeline and three classed AI-ready: a market being contracted before it is built. Thailand's $0.128/kWh, roughly half Singapore's $0.262, is the underlying draw. For a buyer that means asking rates are set in pre-lease negotiation with no published benchmark to anchor against, one site here carries Tier III or IV certification, and backhaul to the carrier facilities in Bangkok should be priced as a separate line rather than assumed.

Frequently asked questions

How much does colocation cost in Chonburi, Thailand?

No published wholesale $/kW benchmark exists for Chonburi, Thailand yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 12 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Chonburi, Thailand?

Commercial electricity in Chonburi, Thailand is $0.128 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 12 facilities in our catalog, 8 of them announced or under construction.

Where is colocation cheaper near Chonburi, Thailand?

On power alone, Vietnam ($0.080/kWh) run below Chonburi, Thailand. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Chonburi, Thailand market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
CtrlS Chonburi CampusCtrlS Datacenters150Announced
DayOne Chonburi Tech Park (CTP1)DayOne Data Centers180Under construction
GSA02 Chonburi CampusGSA Data Center (Gulf, Singtel Nxera, AIS)Announced
NTT Bangkok 2NTT Global Data Centers3Operational
NTT Bangkok 3NTT Global Data Centers12Under construction
SUPERNAP ThailandSUPERNAP (Thailand)IVOperational
Digital Edge–B.Grimm Chonburi CampusDigital Edge / B.Grimm Power100Under construction
Bridge Data Centres IIO ChonburiBridge Data Centres IIO (Thailand) Co., Ltd.134Announced
Vistas Technology Amata City ChonburiVistas Technology (ZDATA Technologies)80Announced
NTT Bangkok 4NTT Global Data Centers100Under construction
TCC Technology Amata Nakorn Data Center (AMDC)T.C.C. TechnologyOperational
SUPERNAP Thailand, Sector 1SUPERNAP (Thailand) / China MobileIVOperational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.