▮▮Coloprice
← Turkey

8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Ankara: 8 facilities, colocation pricing

Colocation pricing and providers in Ankara →

How many data centers are in Ankara?

Coloprice tracks 8 data centers in Ankara, Turkey: 6 operational, 1 under construction and 1 announced, run by 8 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.099

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · 122+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Ankara (Temelli), Turkey· · ·$0.0998—
Greece· · ·$0.22121—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Ankara?

Coloprice tracks 8 data centers in Ankara, Turkey: 6 operational, 1 under construction and 1 announced, run by 8 operators.

Which operators run data centers in Ankara?

By number of facilities tracked: Turkcell (1), Khazna Data Centers (1), KKB Kredi Kayıt Bürosu A.Ş. (1), 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. (1), Mars Datacenter (1).

What is the total data center power capacity in Ankara?

Facilities that publish capacity add up to 122 MW (2 of 8 sites disclose a figure); the largest published site is Khazna Ankara (Başkent OIZ) with 100 MW.

How much does colocation cost in Ankara (Temelli), Turkey?

No published wholesale $/kW benchmark exists for Ankara (Temelli), Turkey yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Ankara (Temelli), Turkey?

Commercial electricity in Ankara (Temelli), Turkey is $0.099 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 2 of them announced or under construction.

Where is colocation cheaper near Ankara (Temelli), Turkey?

Ankara (Temelli), Turkey sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Ankara (Temelli), Turkey market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Ankara (Temelli) vs IstanbulAnkara (Temelli) vs İzmir (Gaziemir)

Data centers

FacilityOperatorPower, MWTierStatus
Turkcell Ankara Data CenterTurkcell—IIIOperational
Khazna Ankara (Başkent OIZ)Khazna Data Centers100—Announced
KKB Anadolu Veri MerkeziKKB Kredi Kayıt Bürosu A.Ş.—IVOperational
3C1B HUAWEI FUSION DC ANKARA3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S.——Operational
Mars Datacenter Ankara-1Mars Datacenter——Operational
VAULTR ANKARA DATACENTERVaultr Veri Merkezi Hizmetleri A.S.——Operational
Digital Realty × Rönesans Ankara (Başkent OIZ)Digital Realty / Rönesans Infrastructure22—Under construction
3C1B Tepe Prime Data Center3C1B Telekomunikasyon——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.