ENKA Tuzla Data Center-01
Under constructionİstasyon Mahallesi, Araplar Caddesi 127 Sokak No:10, Tuzla, Istanbul, Turkey
ENKA Tuzla Data Center-01 is a data center (Uptime Tier III, design certified) in Istanbul (Tuzla), Turkey, operated by ENKA Data Solutions, with 20 MW of published IT capacity, currently under construction.
ENKA Tuzla Data Center-01 is an 11 MW IT-load, 20 MW total-power colocation facility under construction in Tuzla, Istanbul, developed by ENKA Data Solutions with Uptime Institute Tier III design certification and completion targeted for 2027.

- Operator
- ENKA Data Solutions
- City
- Istanbul (Tuzla), Turkey
- Power, MW
- 20 MW
- Cooling
- Air
- Uptime Tier
- III · design certified
- Floor space
- 13,372 m²
- AI-ready
- Yes
Coloprice Score
41 out of 100
Class D · #5 of 16 in Turkey
- Resilience16/35
- Compliance0/20
- Transparency9/20
- Scale13/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
ENKA Tuzla Data Center-01 is a colocation facility under construction at İstasyon Mahallesi, Araplar Caddesi, in the Tuzla district of Istanbul, developed by ENKA Data Solutions, a subsidiary of the Turkish construction conglomerate ENKA İnşaat ve Sanayi A.Ş. The design calls for 20 MW of total power and 11 MW of IT load — split between 10 MW of standard halls and 1 MW dedicated to a GPU hall — across six data halls and more than 1,200 cabinets, spanning roughly 13,372 sqm of construction area plus a separate seismic-isolator floor and terraces. Uptime Institute has awarded the design a Tier III Certification of Design Documents; a constructed-facility certification has not yet been issued because the building is still being finished. As of ENKA's own August 2026 progress update, rough construction was complete and MEP/commissioning work was underway, with partial completion targeted for November 2026 and full completion for 2027.
- ▮20 MW total power / 11 MW IT load (10 MW standard + 1 MW GPU hall)
- ▮Six data halls, 1,200+ cabinets planned
- ▮~13,372 sqm construction area plus seismic-isolator floor
- ▮Uptime Institute Tier III Certification of Design Documents (constructed-facility award pending)
- ▮Under construction; partial completion targeted Nov 2026, full completion 2027
Colocation pricing: Turkey & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Istanbul (Tuzla)
Source — Verified against operator sources · data pending on-site verification