▮▮Coloprice

Yondr London Campus - Building 1

Operational

Yondr London Campus - Building 1 is a data center in Slough, United Kingdom, operated by Yondr Group, with 30 MW of published IT capacity, currently operational.

First building of Yondr Group's Slough data center campus outside London, a 30 MW facility on a former paint factory site that reached ready-for-service in July 2024.

Yondr London Campus - Building 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Yondr Group
City
Slough, United Kingdom
Power, MW
30 MW
Cooling
Air
—

Coloprice Score

22 out of 100

limited data · #79 of 120 in United Kingdom

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Yondr London Campus - Building 1 — Coloprice Score 22
<a href="https://coloprice.com/data-centers/uk/slough/yondr-london-campus-slough-1/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/yondr-london-campus-slough-1.svg"
    alt="Yondr London Campus - Building 1 — Coloprice Score 22" height="64">
</a>

Yondr Group's first UK data center sits on a former paint factory site in Slough, west of London, one of Europe's most established data center hubs on the M4 corridor. Construction began in 2022 and the 30 MW building reached ready-for-service in July 2024, with the first 20 MW phase entering operation before the remaining capacity followed. The building is targeting BREEAM 'Very Good' certification and uses hydrotreated vegetable oil (HVO) instead of diesel in its backup generators to cut emissions. It is the first of what became a three-building, 100+ MW campus, and the site has since anchored an apprenticeship program run with a local University Technical College near Heathrow. Yondr has not disclosed a street address for the campus, only its general Slough location.

  • ▮First of three buildings on Yondr's Slough campus, ready-for-service July 2024
  • ▮30 MW capacity, built on a former paint factory site
  • ▮Targeting BREEAM 'Very Good' certification
  • ▮Uses HVO instead of diesel in backup generators

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Slough

Source — Verified against operator sources · data pending on-site verification