14 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Slough: 14 facilities, colocation pricing
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.454
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 86+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Slough, United Kingdom | · · · | $0.454 | 14 | — |
| Netherlands | · · · | $0.179 | 61 | — |
| Ireland | · · · | $0.210 | 26 | — |
| Germany | · · · | $0.269 | 122 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How much does colocation cost in Slough, United Kingdom?
No published wholesale $/kW benchmark exists for Slough, United Kingdom yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 14 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Slough, United Kingdom?
Commercial electricity in Slough, United Kingdom is $0.454 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 14 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Slough, United Kingdom?
On power alone, Netherlands ($0.179/kWh), Ireland ($0.210/kWh), Germany ($0.269/kWh) run below Slough, United Kingdom. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Slough, United Kingdom market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Equinix LD4 | Equinix | — | — | Operational |
| VIRTUS Slough Campus | VIRTUS Data Centres | 63 | — | Operational |
| Equinix LD6 | Equinix | — | — | Operational |
| Equinix LD7 | Equinix | — | — | Operational |
| Equinix LD10 | Equinix | — | — | Operational |
| Equinix LD11x | Equinix | — | — | Operational |
| Equinix LD13x | Equinix | — | — | Operational |
| Equinix LD5 | Equinix | — | — | Operational |
| LHR26 | Digital Realty (Interxion) | — | — | Operational |
| LHR27 | Digital Realty (Interxion) | — | — | Operational |
| Kao Data Slough (KLON-06) | Kao Data | 20 | — | Operational |
| NTT Slough 2 Data Center | NTT Global Data Centers | — | — | Operational |
| NTT Slough 3 Data Center | NTT Global Data Centers | 2.7 | — | Operational |
| China Mobile International UK Data Centre | China Mobile International | — | — | Operational |