▮▮Coloprice
← United Kingdom

23 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Slough: 23 facilities, colocation pricing

Colocation pricing and providers in Slough →

How many data centers are in Slough?

Coloprice tracks 23 data centers in Slough, United Kingdom: 22 operational, 1 under construction and 0 announced, run by 10 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.454

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 239+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Slough, United Kingdom· · ·$0.45423—
Netherlands$180$0.179133—
Ireland· · ·$0.21034—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Slough?

Coloprice tracks 23 data centers in Slough, United Kingdom: 22 operational, 1 under construction and 0 announced, run by 10 operators.

Which operators run data centers in Slough?

By number of facilities tracked: Equinix (7), CyrusOne (4), Yondr Group (3), Digital Realty (2), NTT Global Data Centers (2).

What is the total data center power capacity in Slough?

Facilities that publish capacity add up to 239 MW (10 of 23 sites disclose a figure); the largest published site is VIRTUS Slough Campus with 63 MW.

How much does colocation cost in Slough, United Kingdom?

No published wholesale $/kW benchmark exists for Slough, United Kingdom yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 23 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Slough, United Kingdom?

Commercial electricity in Slough, United Kingdom is $0.454 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 23 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Slough, United Kingdom?

On power alone, Netherlands ($0.179/kWh), Ireland ($0.210/kWh), Germany ($0.269/kWh) run below Slough, United Kingdom. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Slough, United Kingdom market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

London vs SloughManchester vs SloughLeeds vs Slough

Data centers

FacilityOperatorPower, MWTierStatus
Equinix LD4Equinix——Operational
VIRTUS Slough CampusVIRTUS Data Centres63—Operational
Equinix LD6Equinix——Operational
Equinix LD7Equinix——Operational
Equinix LD10Equinix——Operational
Equinix LD11xEquinix——Operational
Equinix LD13xEquinix——Operational
Equinix LD5Equinix——Operational
LHR26Digital Realty——Operational
LHR27Digital Realty——Operational
CyrusOne LON1CyrusOne8.72—Operational
CyrusOne LON3CyrusOne9—Operational
CyrusOne LON4CyrusOne18—Operational
CyrusOne LON5CyrusOne18—Operational
Kao Data Slough (KLON-06)Kao Data20—Operational
NTT Slough 2 Data CenterNTT Global Data Centers——Operational
NTT Slough 3 Data CenterNTT Global Data Centers2.7—Operational
China Mobile International UK Data CentreChina Mobile International——Operational
Yondr London Campus - Building 1Yondr Group30—Operational
Yondr London Campus - Building 2Yondr Group30—Operational
Yondr London Campus - Building 3Yondr Group40—Under construction
Rackspace SloughRackspace——Operational
Iron Mountain Data Center - London (LON-1)Iron Mountain——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.