▮▮Coloprice

Crusoe Abilene AI Campus (Microsoft, 900 MW)

Under construction

Crusoe Abilene AI Campus (Microsoft, 900 MW) is a data center in Abilene, TX, United States, operated by Crusoe, with 900 MW of published IT capacity, currently under construction.

A second, 900 MW Crusoe campus adjacent to its original Abilene, Texas site, built for Microsoft with two buildings each designed for 336 MW of critical IT load and a dedicated on-site power plant.

Crusoe Abilene AI Campus (Microsoft, 900 MW) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Crusoe
City
Abilene, TX, United States
Power, MW
900 MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

22 out of 100

limited data · #497 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Crusoe Abilene AI Campus (Microsoft, 900 MW) — Coloprice Score 22
<a href="https://coloprice.com/data-centers/usa/abilene/crusoe-abilene-microsoft-campus/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/crusoe-abilene-microsoft-campus.svg"
    alt="Crusoe Abilene AI Campus (Microsoft, 900 MW) — Coloprice Score 22" height="64">
</a>

Crusoe announced a second campus adjacent to its existing Abilene, Texas site, this one built specifically for Microsoft rather than the Oracle/OpenAI-linked Stargate campus next door. The new build comprises two buildings, each designed for 336 MW of critical IT load, for a combined 900 MW; Crusoe states that once combined with the existing campus, the full Abilene site reaches approximately 2.1 GW of total capacity. Land clearing and site preparation were underway as of the announcement, with the first building targeted for energization in mid-2027. The design includes dedicated behind-the-meter on-site energy infrastructure — an on-site power plant paired with a medium-voltage battery energy storage system intended to improve reliability and grid resilience — plus closed-loop, non-evaporative liquid cooling built for ultra-high-density compute. Crusoe frames the project as an extension of the build-own-operate model already used at the neighboring campus, with construction expected to bring thousands of temporary jobs and hundreds of permanent positions to the Abilene region.

  • 900 MW campus for Microsoft, two buildings each designed for 336 MW critical IT load
  • Combined with existing Crusoe campus, Abilene site reaches ~2.1 GW total
  • Dedicated on-site power plant plus MV battery energy storage, behind-the-meter
  • Closed-loop, non-evaporative liquid cooling; first building targeted mid-2027

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Abilene, TX

Source — Verified against operator sources · data pending on-site verification