Crusoe Abilene AI Campus (Stargate)

Under construction

Crusoe Abilene AI Campus (Stargate) is a data center in Abilene, TX, United States, operated by Crusoe, with 1200 MW of published IT capacity, currently under construction.

Crusoe's Lancium Clean Campus in Abilene, Texas — the original Stargate-linked site built for Oracle/OpenAI — expanding to 1.2 GW across eight buildings and about 4 million sq ft, with the first two buildings energized in H1 2025.

Crusoe Abilene AI Campus (Stargate) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Crusoe
City
Abilene, TX, United States
Power, MW
1200 MW
Cooling
Liquid
Floor space
371,612 m²
AI-ready
Yes

Coloprice Score

25 out of 100

limited data · #397 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency7/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Crusoe Abilene AI Campus (Stargate) — Coloprice Score 25
<a href="https://coloprice.com/data-centers/usa/abilene/crusoe-abilene-stargate-campus/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/crusoe-abilene-stargate-campus.svg"
    alt="Crusoe Abilene AI Campus (Stargate) — Coloprice Score 25" height="64">
</a>

Crusoe's campus on the Lancium Clean Campus site in Abilene, Texas is the original build associated with the Stargate initiative backed by Oracle and OpenAI, and the flagship of the operator's data center portfolio. Crusoe designed, built and operates the site; the first two buildings, together delivering more than 200 MW of critical IT load, reached energization in the first half of 2025, each housing NVIDIA GB200 NVL72 racks with up to 50,000 GPUs per building on an integrated network fabric. The operator's own figures describe an expansion to eight buildings and roughly 4 million sq ft, taking the campus to a stated 1.2 gigawatts of capacity, with the remaining six buildings targeted for completion around mid-2026. Cooling runs on a closed-loop, direct-to-chip liquid system designed for zero water evaporation, and the site draws on a mix of behind-the-meter battery storage, solar and natural-gas turbines, plus nearby wind resources. Crusoe reports roughly 2,000 workers on site during construction, rising toward 5,000 as the campus completes. The company has since begun a separate, adjacent 900 MW campus at the same location built for Microsoft, distinct from this Stargate-linked build.

  • Original Stargate-linked campus built by Crusoe for Oracle/OpenAI on the Lancium Clean Campus site
  • Expanding to 8 buildings, ~4M sq ft, stated 1.2 GW of capacity
  • First 2 buildings (200+ MW) energized H1 2025 with NVIDIA GB200 NVL72 racks, up to 50,000 GPUs per building
  • Closed-loop direct-to-chip liquid cooling with zero water evaporation
  • Up to ~5,000 workers on site at peak construction

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →