Iron Mountain WPA-1 (Western Pennsylvania)
Operational1137 Branchton Rd, Boyers, PA 16020
Iron Mountain WPA-1 (Western Pennsylvania) is a data center in Boyers, United States, operated by Iron Mountain, with 15.5 MW of published IT capacity, currently operational.
15.5 MW data center built 220 feet underground in a former limestone mine near Pittsburgh, cooled by a geothermal system through a 100-acre underground reservoir.

- Operator
- Iron Mountain
- City
- Boyers, United States
- Power, MW
- 15.5 MW
- Cooling
- Liquid
- Floor space
- 30,658 m²
Coloprice Score
59 out of 100
Class C · #6 of 574 in United States
- Resilience10/35
- Compliance20/20
- Transparency9/20
- Scale13/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Iron Mountain's Western Pennsylvania data center occupies part of a 315-acre underground campus in a former limestone mine near Boyers, roughly an hour north of Pittsburgh, 220 feet below the surface. The site has served as the operator's flagship US records and information-management facility for decades, and the data center built into it uses a geothermal cooling system drawing on a 100-acre underground reservoir — recognized by the US Department of Energy as a Better Buildings Showcase Project — to cut mechanical cooling load. The facility offers 330,000 square feet of colocation space with 15.5 MW of capacity, N+1 electrical redundancy and A/B power feeds. Being underground gives the site natural protection from surface weather events and physical intrusion, a differentiator Iron Mountain markets alongside its standard global compliance stack (ISO 27001/50001/14001/22301/9001, SOC 2 Type II, SOC 3, TIA-942, NIST 800-53, FISMA High, FedRAMP, PCI-DSS, HIPAA, HITRUST, EPA Energy Star). No specific Tier rating or opening year for the data center portion is published; the mine complex itself has operated as a Iron Mountain records facility since the 1950s.
- ▮220 feet underground in a former limestone mine, 315-acre campus
- ▮15.5 MW, 330,000 sq ft, N+1 with A/B power feeds
- ▮Geothermal cooling via 100-acre underground reservoir — DOE Better Buildings Showcase
- ▮Natural physical protection from weather and intrusion
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification