▮▮Coloprice

TierPoint TekPark

Operational

TierPoint TekPark is a data center in Breinigsville, United States, operated by TierPoint, currently operational.

TierPoint's TekPark campus in Breinigsville, Pennsylvania (Lehigh Valley), the operator's largest disclosed data center by generator capacity, marketed for AI and GPU high-density workloads.

TierPoint TekPark — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

8 of 14 fields published · Operator? Add or correct data →

Units
Operator
TierPoint
City
Breinigsville, United States
Power, MW
—
Cooling
Air
Floor space
11,334 m²
AI-ready
Yes
Market benchmark
$196 per kW per month wholesale · United States
Index rate for the market, not this operator’s price list
Address
9999 Hamilton Boulevard, Building #4, Breinigsville, PA 18031 · Open in maps ↗
SOC 1 Type IISOC 2 Type IIISO 27001

2 sources · data pending on-site verification

E

Coloprice Score

26 out of 100

Class E · #497 of 1332 in United States

  • Resilience6/35
  • Compliance6/20
  • Transparency5/20
  • Scale2/15
  • Maturity7/10
How the score is calculated →
Embed score badge
TierPoint TekPark — Coloprice Score 26
<a href="https://coloprice.com/data-centers/usa/breinigsville/tierpoint-tekpark-breinigsville/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/tierpoint-tekpark-breinigsville.svg"
    alt="TierPoint TekPark — Coloprice Score 26" height="64">
</a>

Connectivity: 5 networks and 0 internet exchanges are present in this facility.

TierPoint's TekPark campus sits on a 137-acre site in Breinigsville, in the Lehigh Valley outside Allentown, Pennsylvania. It is one of two TierPoint buildings the operator lists in this metro area — the other being a smaller facility about 6 km away in Bethlehem — and by disclosed generator count it is the largest in TierPoint's 40-site US portfolio: fifteen 2.5 MW units plus eight 2 MW units, or roughly 55 MW of backup capacity, on dual redundant 69 kV utility feeds with a minimum 36 hours of on-site fuel. The building holds 122,000+ sq ft total, including 96,000+ sq ft of raised floor. TierPoint markets the campus as built for AI and GPU workloads, citing high-density colocation capacity and room for future campus expansion on the site. The operator states SOC 1 Type II and SOC 2 Type II audits and ISO 27001 certification for the facility, and says it supports HIPAA, PCI-DSS, HITRUST, GLBA and ITAR environments. No specific Uptime Institute Tier rating, PUE or rack-density figure is published for the building.

  • ▮122,000+ sq ft total, 96,000+ sq ft raised floor — largest generator capacity (~55 MW) disclosed in TierPoint's US portfolio
  • ▮137-acre campus in Breinigsville, Lehigh Valley, with room for future expansion
  • ▮Marketed for AI and GPU high-density workloads
  • ▮Dual redundant 69 kV utility feeds; minimum 36 hours on-site fuel
  • ▮SOC 1/SOC 2 audited, ISO 27001 certified

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Compare with nearby facilities

FacilityOperatorPower, MWTierStatuskm
TierPoint TekParkTierPoint——Operational0
TierPoint Valley ForgeTierPoint——Operational51

Source — Verified against operator sources · data pending on-site verification