▮▮Coloprice

ElMirageAZ.gov Compass PHX II data center search: verified campus facts

Under construction

Compass El Mirage Campus is a data center in El Mirage, AZ, United States, operated by Compass Datacenters, with 108 MW of published IT capacity, currently under construction.

Compass's 108 MW campus under construction in El Mirage, Arizona, one of two Phoenix-metro sites the operator lists alongside a larger, separate 212 MW campus in Goodyear.

Compass El Mirage Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction

5 of 14 fields published · Operator? Add or correct data →

Units
Operator
Compass Datacenters
City
El Mirage, AZ, United States
Power, MW
108 MW
Cooling
Air
Market benchmark
$196 per kW per month wholesale · United States
Index rate for the market, not this operator’s price list

2 sources · data pending on-site verification

—

Coloprice Score

18 out of 100

limited data · #794 of 1332 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Compass El Mirage Campus — Coloprice Score 18
<a href="https://coloprice.com/data-centers/usa/el-mirage/compass-el-mirage-az/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/compass-el-mirage-az.svg"
    alt="Compass El Mirage Campus — Coloprice Score 18" height="64">
</a>

Compass Datacenters is developing a 108 MW campus in El Mirage, Arizona, one of two Phoenix-metro sites the company lists alongside a larger, separate 212 MW campus in Goodyear. Compass does not publish the El Mirage campus's building count, land size or planned in-service date on its market pages. The site shares a property line with the Northwest Valley Family YMCA, and as part of what Compass calls a '100-year neighbor philosophy,' the company committed more than $110,500 to fund a permanent 98-by-60-foot shade structure over the YMCA's outdoor basketball court, with construction expected to finish by the end of 2026. Compass frames the investment as the start of what it describes as a decades-long presence in El Mirage rather than a one-off gesture tied to the data center build. As of this listing the campus is under construction; no operational date, tenant, or power-on milestone has been announced publicly. The Phoenix market is attractive to Compass and other hyperscale-focused developers for its proximity to West Coast tech demand without California's land and power constraints.

  • ▮108 MW campus under construction in El Mirage, Arizona
  • ▮One of two Compass Phoenix-metro sites (alongside a separate 212 MW Goodyear campus)
  • ▮$110,500+ committed to a YMCA shade structure on the adjacent property
  • ▮No building count, land size or in-service date published
  • ▮No operational date or anchor tenant announced

Compass PHX II and the El Mirage public record

The Coloprice record describes Compass Datacenters’ second Phoenix-area campus in El Mirage, Arizona. The planned campus comprises three buildings and approximately 108 MW of IT load; its catalog status is construction rather than operational.

A search containing “ElMirageAZ.gov Compass PHX II data center” points to municipal evidence intent. Project approvals, site plans, water, utility and meeting records should be verified on the City of El Mirage public website. The operator source establishes the market and campus positioning, while municipal documents establish local approvals and conditions.

Future capacity should not be treated as available colocation. Before using PHX II in a procurement shortlist, verify the current construction milestone, energisation date, available IT load, density, cooling design, carrier routes, contractual delivery remedy and the exact phase covered by any published MW figure.

  • Catalog status: construction.
  • Planned scale in the sourced record: approximately 108 MW across three buildings.
  • Local approvals and conditions require municipal-source verification.

Compass El Mirage Campus FAQ

Is Compass PHX II operational?

No. The current Coloprice record marks the El Mirage campus as under construction.

How large is the planned Compass El Mirage campus?

The sourced record describes approximately 108 MW of IT load across three planned buildings.

Where should local approval details be checked?

Use the City of El Mirage public website and its planning or meeting records for local approvals and conditions; do not infer them from an operator profile.

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification