▮▮Coloprice

TierPoint Nashville

Operational

311 Eddy Lane, Franklin, TN 37064

TierPoint Nashville is a data center (Uptime Tier III, design certified) in Franklin, United States, operated by TierPoint, currently operational.

TierPoint's Nashville-market data center, physically located in Franklin, Tennessee, which the operator says is the only data center in the state with both Uptime Institute Tier III (design and construction) and LEED Gold certification.

TierPoint Nashville — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
TierPoint
City
Franklin, United States
Power, MW
Cooling
Air
Uptime Tier
III · design certified
Floor space
4,831 m²
SOC 2 Type IIHIPAAPCI-DSSISO 27001Uptime Institute Tier III (design & construction)LEED Gold
D

Coloprice Score

43 out of 100

Class D · #63 of 574 in United States

  • Resilience16/35
  • Compliance15/20
  • Transparency5/20
  • Scale0/15
  • Maturity7/10
How the score is calculated →
Embed score badge
TierPoint Nashville — Coloprice Score 43
<a href="https://coloprice.com/data-centers/usa/franklin/tierpoint-nashville-franklin/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/tierpoint-nashville-franklin.svg"
    alt="TierPoint Nashville — Coloprice Score 43" height="64">
</a>

Connectivity: 4 networks and 0 internet exchanges are present in this facility. Source: PeeringDB →

TierPoint's Nashville-market data center is physically located in Franklin, Tennessee, about 30 km south of downtown Nashville, at 311 Eddy Lane. The operator states it is the only data center in Tennessee to hold both Uptime Institute Tier III certification for design and construction and LEED Gold certification, pairing an availability rating with an environmental-sustainability one. The building totals 52,000+ sq ft, with 26,000+ sq ft of raised floor and roughly 1,300 sq ft of business-continuity seating space. Backup power comes from four 2 MW redundant generators, about 8 MW combined, each rated for a minimum 48-hour runtime. TierPoint also lists SOC 1 Type II and SOC 2 Type II audits and ISO 27001 certification for the site, plus HIPAA, PCI-DSS, GLBA and NIST SP 800-53 coverage and ITAR/Data Privacy Framework registration. No specific IT critical-load capacity, PUE or cooling architecture is disclosed; the generator figures describe backup capacity rather than usable power.

  • Only Tennessee data center TierPoint says holds both Uptime Institute Tier III (design & construction) and LEED Gold certification
  • 52,000+ sq ft total, 26,000+ sq ft raised floor
  • Four 2 MW redundant generators (~8 MW combined backup)
  • SOC 1/SOC 2 audited, ISO 27001 certified

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification