Switch The Core Campus (Las Vegas)
OperationalSwitch The Core Campus (Las Vegas) is a data center in Las Vegas, United States, operated by Switch, with 495 MW of published IT capacity, currently operational.
Switch's original Las Vegas exascale campus, rated Tier 5 Platinum and planned for up to 495 MW at full build, running on 100% renewable power.

- Operator
- Switch
- City
- Las Vegas, United States
- Power, MW
- 495 MW
- Cooling
- Liquid
- Renewable energy
- 100%
- Market benchmark
- $196 per kW per month wholesale · United States
- Index rate for the market, not this operator’s price list
1 sources · data pending on-site verification
Coloprice Score
27 out of 100
limited data · #435 of 1332 in United States
- Resilience0/35
- Compliance0/20
- Transparency7/20
- Scale13/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
The Core Campus in Las Vegas is Switch's founding data center campus, the site that established the company's SUPERNAP brand before Switch rebranded its rating scheme as Tier 5 Platinum. The operator plans up to 495 MW of power at full build-out, with cabinets supporting as much as 2 MW each — an unusually high published density figure aimed at hyperscale and AI customers. The campus runs entirely on renewable energy under Switch's power-uptime guarantee, and connects to Switch's other Nevada campus, The Citadel in Tahoe Reno, over a dedicated 7 ms SUPERLOOP fiber link. Nevada's low sales and property tax rates for data center equipment, combined with the state's lack of income tax, are a recurring part of Switch's pitch for the market, alongside claimed latency of about 5 ms to Los Angeles. Switch does not break out individual building names, footprints or exact commissioned capacity for the Core Campus on its public facility page, describing the whole site at the campus level.
- ▮Up to 495 MW planned capacity, Tier 5 Platinum rating
- ▮Up to 2 MW per cabinet available
- ▮100% renewable energy, 100% power uptime guarantee
- ▮7 ms SUPERLOOP fiber link to The Citadel (Tahoe Reno)
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Las Vegas: free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Las Vegas
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| Switch The Core Campus (Las Vegas) | Switch | 495 | — | Operational |
| DataBank LAS1 | DataBank | 3.35 | — | Operational |
| Flexential Las Vegas - Downtown | Flexential | 1.37 | — | Operational |
| Flexential Las Vegas - North | Flexential | 9 | — | Operational |
| EdgeConneX Las Vegas | EdgeConneX | — | — | Operational |
| ValorC3 Data Centers St. George | ValorC3 Data Centers | — | — | Operational |
Source — Verified against operator sources · data pending on-site verification