xAI Colossus 1

Operational

3231 Paul R Lowry Road, Memphis, TN

xAI Colossus 1 is a data center in Memphis, TN, United States, operated by xAI, with 150 MW of published IT capacity, currently operational.

xAI's Colossus supercomputer at a former Electrolux plant in Memphis, Tennessee, built in 122 days and running on 100,000 NVIDIA Hopper GPUs (doubling toward 200,000), with 150 MW of grid power delivered through a dedicated substation.

xAI Colossus 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation
Operator
xAI
City
Memphis, TN, United States
Power, MW
150 MW
Cooling
Liquid
Floor space
72,933 m²
AI-ready
Yes
E

Coloprice Score

31 out of 100

Class E · #253 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale15/15
  • Maturity7/10
How the score is calculated →
Embed score badge
xAI Colossus 1 — Coloprice Score 31
<a href="https://coloprice.com/data-centers/usa/memphis/xai-colossus-1-memphis/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/xai-colossus-1-memphis.svg"
    alt="xAI Colossus 1 — Coloprice Score 31" height="64">
</a>

Colossus is xAI's flagship AI training supercomputer, built at a former Electrolux manufacturing plant in the Whitehaven area of Memphis, Tennessee. NVIDIA's own newsroom, quoting xAI, states the system was built "in just 122 days" and started training within 19 days of the first rack rolling onto the floor, running an initial 100,000 NVIDIA Hopper GPUs that xAI has described doubling to a combined 200,000. Phase I reached full operational capability on 1 May 2025, drawing 150 MW of grid power from MLGW and TVA through a newly built substation (#63), backed by 150 MW of Tesla Megapack battery storage for backup; a second substation was planned to bring further capacity online in the following months. The 785,000 sq ft, 217-acre property was sold in May 2026 by an affiliate of Phoenix Investors to a subsidiary of SpaceX for $185 million, with the sale documentation naming the site "Colossus I" — xAI continues to operate the facility as the compute cluster training its Grok models.

  • Built in 122 days; 100,000 NVIDIA Hopper GPUs doubling toward 200,000, per xAI/NVIDIA
  • 150 MW of grid power (MLGW/TVA) via a dedicated substation, plus 150 MW of Tesla Megapack backup
  • Phase I fully operational 1 May 2025 at the former Electrolux plant, Whitehaven, Memphis
  • 785,000 sq ft on 217 acres; sold to a SpaceX subsidiary for $185M in May 2026, xAI remains operator
  • Trains xAI's Grok models

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Memphis, TN