▮▮Coloprice

Google Mesa

Operational

Google Mesa is a data center in Mesa, AZ, United States, operated by Google, currently operational.

Google's Mesa, Arizona data center, under construction from 2023 and operational by 2025, backed by more than 430 MW of new carbon-free generation from Salt River Project and NextEra Energy Resources solar plants.

Google Mesa — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Google
City
Mesa, AZ, United States
Power, MW
Cooling
Air
AI-ready
Yes

Coloprice Score

9 out of 100

limited data · #757 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency0/20
  • Scale2/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Google Mesa — Coloprice Score 9
<a href="https://coloprice.com/data-centers/usa/mesa/google-mesa-az/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/google-mesa-az.svg"
    alt="Google Mesa — Coloprice Score 9" height="64">
</a>

Google broke ground on its Mesa, Arizona campus in 2023 and brought it into operation in 2025, joining Compass Datacenters, STACK Infrastructure and other operators already active in the Phoenix-area market covered elsewhere in this catalog. The facility uses air-cooled technology, a choice Google frames around limiting water draw in a desert market where data center water use has drawn local scrutiny. To power the site, Google worked with utility Salt River Project and NextEra Energy Resources to bring more than 430 megawatts of new carbon-free generation onto the grid, sourced from three named solar plants — Sonoran Solar Energy Center, Storey Energy Center and Babbitt Ranch Energy Center. Google has set a target of at least 80% hourly carbon-free energy for the Mesa campus by 2030, part of its broader company-wide goal of 24/7 carbon-free operation by the same year. The company has not published a construction-cost figure, IT power capacity, building count or floor area for the Mesa site itself; disclosed community contributions are limited to a $100,000 Mesa College Promise tuition grant and an annual tree-planting program.

  • Construction began 2023, operational 2025
  • Air-cooled design to limit water consumption in the Phoenix desert market
  • 430+ MW new carbon-free generation via SRP + NextEra (3 named solar plants)
  • Target: 80% hourly carbon-free energy by 2030 for this campus
  • No construction cost, MW capacity, or building count published

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Mesa, AZ

Source — Verified against operator sources · data pending on-site verification