▮▮Coloprice

Novva Mesa

Under construction

Novva Mesa is a data center in Mesa, United States, operated by Novva Data Centers, with 300 MW of published IT capacity, currently under construction.

Novva's Mesa, Arizona campus is planned as a 300 MW, two-phase build across 160 acres, with five data halls totaling about 1.3 million sq ft of data hall space plus 200,000 sq ft of offices, using water-free cooling with solar-powered atmospheric water generators.

Novva Mesa — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Novva Data Centers
City
Mesa, United States
Power, MW
300 MW
Cooling
Air
Floor space
120,774 m²
AI-ready
Yes
SOC 1SOC 2PCI DSS Attestation of ComplianceHIPAA
D

Coloprice Score

40 out of 100

Class D · #137 of 804 in United States

  • Resilience6/35
  • Compliance11/20
  • Transparency7/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Novva Mesa — Coloprice Score 40
<a href="https://coloprice.com/data-centers/usa/mesa/novva-mesa/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/novva-mesa.svg"
    alt="Novva Mesa — Coloprice Score 40" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Novva Mesa — Best data center in Mesa, United States 2026
#1 of 5 · See the list →

Novva's Arizona campus in Mesa is the operator's largest announced site, planned at 300 MW of capacity built out in two phases across 160 acres. The design calls for five data halls totaling about 1.3 million sq ft of data hall space plus 200,000 sq ft of office space. Cooling is water-free, combining heat-reducing paint and cool pavement around outdoor equipment with solar-powered atmospheric water generators, continuing the approach Novva uses at its other Southwest US sites; the operator also cites 24/7 security with robot and drone monitoring. No exact street address, opening year or current build-out status beyond "campus built over 2 phases" is disclosed, so the facility is treated here as under construction rather than fully operational. Compliance attestations published for the site are SOC 1, SOC 2, HIPAA and PCI DSS; no Uptime Institute or TIA-942 Tier certification is published.

  • Planned 300 MW capacity across two phases, 160-acre campus
  • Five data halls, about 1.3 million sq ft of data hall space plus 200,000 sq ft of offices
  • Water-free cooling with heat-reducing paint, cool pavement and solar-powered atmospheric water generators
  • 24/7 security including robot and drone monitoring (operator's own description)
  • No exact address, opening year or Tier certification published

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Mesa

Source — Verified against operator sources · data pending on-site verification