▮▮Coloprice

Iron Mountain MIA-1

Under construction

2925 NW 120th Terrace, Miami, FL 33167

Iron Mountain MIA-1 is a data center in Miami, United States, operated by Iron Mountain, with 16 MW of published IT capacity, currently under construction.

Purpose-built Tier III, GPU-ready data center under construction on a 3.4-acre campus in Miami, Florida, expected in 2026.

Iron Mountain MIA-1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Iron Mountain
City
Miami, United States
Power, MW
16 MW
Cooling
Liquid
Floor space
13,935 m²
E

Coloprice Score

25 out of 100

Class E · #351 of 574 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Iron Mountain MIA-1 — Coloprice Score 25
<a href="https://coloprice.com/data-centers/usa/miami/iron-mountain-mia1-miami/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/iron-mountain-mia1-miami.svg"
    alt="Iron Mountain MIA-1 — Coloprice Score 25" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Iron Mountain MIA-1 — Best data center in Miami, United States 2026
#1 of 4 · See the list →

MIA-1 is Iron Mountain's first purpose-built data center in Florida, rising on a 3.4-acre site in northwest Miami about 8 miles from Miami International Airport. The operator designs the building to Tier III standards with diverse utility feeds and 26 MVA of total redundant operational power against 16 MW of customer IT load, and pitches the raised-floor data halls as GPU-ready for high-density AI deployments. Construction targets Category 5 hurricane-resistant design, a requirement in a market exposed to Atlantic storms, and the operator says it is building toward its standard global compliance program with BREEAM low-impact accreditation targeted rather than already certified. Iron Mountain frames MIA-1 as matched to 100% renewable energy on completion and as a carrier-neutral facility with diverse network entry points, positioning it to compete with the Equinix, NTT and Digital Realty presence already established in South Florida. As of its facility page, the project was still under construction with a 2026 completion target and no certifications yet finalized.

  • 16 MW customer IT load, 26 MVA total redundant power, 150,000 sq ft
  • Tier III purpose-built design, GPU-ready high-density halls
  • Category 5 hurricane-resistant construction on a 3.4-acre site
  • Expected completion 2026; certifications targeted, not yet finalized

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Miami

Source — Verified against operator sources · data pending on-site verification