Flexential Portland - Hillsboro 5

Under construction

4975 NE Starr Blvd, Hillsboro, OR 97124, United States

Flexential Portland - Hillsboro 5 is a data center in Portland (Hillsboro), United States, operated by Flexential, with 36 MW of published IT capacity, currently under construction.

A 358,000 sq ft, 36 MW Flexential building under construction at 4975 NE Starr Blvd in Hillsboro, next to the operator's existing Hillsboro 4 site, liquid-cooling-ready for up to 80+ kW per cabinet.

Flexential Portland - Hillsboro 5 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Flexential
City
Portland (Hillsboro), United States
Power, MW
36 MW
Cooling
Liquid
Floor space
33,259 m²
E

Coloprice Score

25 out of 100

Class E · #404 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Flexential Portland - Hillsboro 5 — Coloprice Score 25
<a href="https://coloprice.com/data-centers/usa/portland/flexential-portland-hillsboro-5/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/flexential-portland-hillsboro-5.svg"
    alt="Flexential Portland - Hillsboro 5 — Coloprice Score 25" height="64">
</a>

Connectivity: 10 networks and 1 internet exchanges are present in this facility. Source: PeeringDB →

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Flexential Portland - Hillsboro 5 — Top 10 data centers in Portland (Hillsboro), United States 2026
#7 of 18 · See the list →

Flexential's Hillsboro 5 building, at 4975 NE Starr Boulevard, is under construction immediately next to the operator's existing Hillsboro 4 facility in Oregon's Silicon Forest submarket west of Portland. The building is designed for 358,000 sq ft and 36 MW of critical power on a 5:4 distributed-redundant UPS configuration with N+2 cooling, targeting a 1.4 power usage effectiveness once operational. Flexential positions the site as liquid-cooling-ready for up to 80+ kW per cabinet, aimed at AI and high-performance-computing tenants rather than conventional enterprise colocation loads — the same positioning the operator has used for its newer-generation buildings in Atlanta, Denver and Dallas. A September 2025 press release announcing a sixth Hillsboro building described Hillsboro 5 as already under construction and expected to come online the following year, and Flexential's August 2026 $800 million financing release again listed it among projects underway. No third-party Uptime Institute or TIA-942 certification, general contractor, or confirmed energization date is published for the building.

  • 358,000 sq ft, 36 MW building under construction next to Hillsboro 4
  • 5:4 distributed-redundant UPS, N+2 cooling, target 1.4 PUE
  • Liquid-cooling-ready for 80+ kW per cabinet (AI/HPC positioning)
  • Referenced as under construction in Flexential's Sept 2025 and Aug 2026 releases
  • Fifth Flexential-branded building in the Hillsboro/Portland cluster

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: