Aligned Data Centers Project Phoenix

Under construction

Shippingport Industrial Park, Shippingport, PA (Beaver County)

Aligned Data Centers Project Phoenix is a data center in Shippingport, Pennsylvania, United States, operated by Aligned Data Centers, with 2000 MW of published IT capacity, currently under construction.

2 GW, three-building hyperscale AI/HPC campus breaking ground on the former Bruce Mansfield coal-plant site in Shippingport, Pennsylvania, powered behind-the-meter by an adjacent 3.6 GW natural-gas plant.

Aligned Data Centers Project Phoenix — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Aligned Data Centers
City
Shippingport, Pennsylvania, United States
Power, MW
2000 MW
Cooling
Air
AI-ready
Yes

Coloprice Score

22 out of 100

limited data · #516 of 837 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency6/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Aligned Data Centers Project Phoenix — Coloprice Score 22
<a href="https://coloprice.com/data-centers/usa/shippingport/aligned-project-phoenix-shippingport/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/aligned-project-phoenix-shippingport.svg"
    alt="Aligned Data Centers Project Phoenix — Coloprice Score 22" height="64">
</a>

Aligned Data Centers broke ground on Project Phoenix on September 10, 2026, redeveloping the shuttered 660-acre Bruce Mansfield coal-plant site in Shippingport, Beaver County, roughly 25 miles northwest of Pittsburgh, into a three-building, 2 GW hyperscale AI and HPC campus. Each of the three planned data center buildings spans over 600,000 sq ft, and the site sits directly beside a newly converted 3.6 GW natural-gas power station that Aligned and partner Frontier Group of Companies are redeveloping in tandem, giving the campus dedicated behind-the-meter generation rather than a draw on the regional grid. Aligned says the arrangement should ultimately return surplus capacity to PJM, the grid operator serving Pennsylvania and much of the mid-Atlantic, rather than compete with residential and industrial load for scarce interconnection. The facility's cooling design uses a closed-loop system built around recycled, deionized water, which Aligned says keeps ongoing operational water draw comparable to a standard office building rather than a conventional evaporative-cooled data center. Construction is expected to support roughly 3,000 jobs on site and about 640 permanent operating roles once complete, anchoring an estimated $10 billion in regional investment; no completion date for the first building has been published.

  • Groundbreaking September 10, 2026 on the former Bruce Mansfield coal-plant site, Beaver County
  • 2 GW planned across three buildings, each over 600,000 sq ft
  • Behind-the-meter power from an adjacent 3.6 GW natural-gas plant, not the local grid
  • Closed-loop deionized-water cooling; operational water use comparable to a standard office building
  • ~3,000 construction jobs and ~640 permanent roles; $10B estimated regional investment

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: