TierPoint St. Louis (Locust St.)

Under construction

2300 Locust Street, St. Louis, MO 63103

TierPoint St. Louis (Locust St.) is a data center in St. Louis, United States, operated by TierPoint, currently under construction.

TierPoint data center under development on Locust Street in downtown St. Louis, Missouri, explicitly marketed for large-scale, high-density AI and GPU-accelerated colocation.

TierPoint St. Louis (Locust St.) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
TierPoint
City
St. Louis, United States
Power, MW
Cooling
Air
Floor space
12,620 m²
AI-ready
Yes

Coloprice Score

10 out of 100

limited data · #527 of 574 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency5/20
  • Scale2/15
  • Maturity3/10
How the score is calculated →
Embed score badge
TierPoint St. Louis (Locust St.) — Coloprice Score 10
<a href="https://coloprice.com/data-centers/usa/st-louis/tierpoint-st-louis-locust/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/tierpoint-st-louis-locust.svg"
    alt="TierPoint St. Louis (Locust St.) — Coloprice Score 10" height="64">
</a>

TierPoint's Locust Street building in downtown St. Louis, Missouri, is under development rather than in operation — the only building in the operator's disclosed US portfolio explicitly marketed around AI and GPU workloads from the outset. TierPoint describes the 2300 Locust Street site as intended for large-scale, high-density colocation for AI and GPU-accelerated compute. Phase 1 is planned at 135,840+ sq ft total, with 22,640 sq ft of raised floor and a further 45,000 sq ft reserved for expansion. Backup power is specified as four 2 MW redundant generators, about 8 MW combined, each with a minimum 48-hour runtime, feeding an A-side/B-side distribution design once complete. As a facility still under construction, TierPoint has not yet published compliance certifications, an opening date, cooling architecture or a specific IT power capacity for the site; the generator figures describe planned backup capacity, not usable critical load.

  • Under development — TierPoint's only disclosed US building marketed as purpose-built for AI/GPU workloads from the outset
  • Phase 1: 135,840+ sq ft total, 22,640 sq ft raised floor, plus 45,000 sq ft reserved for expansion
  • Four 2 MW redundant generators planned (~8 MW combined backup)
  • No compliance certifications or opening date published yet

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in St. Louis

Source — Verified against operator sources · data pending on-site verification