8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in St. Louis: 8 facilities, colocation pricing
Colocation pricing and providers in St. Louis →
How many data centers are in St. Louis?
Coloprice tracks 8 data centers in St. Louis, United States: 7 operational, 1 under construction and 0 announced, run by 6 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 4+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| St. Louis, United States | · · · | $0.117 | 8 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| Japan | $280 | $0.185 | 133 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in St. Louis?
Coloprice tracks 8 data centers in St. Louis, United States: 7 operational, 1 under construction and 0 announced, run by 6 operators.
Which operators run data centers in St. Louis?
By number of facilities tracked: TierPoint (2), Netrality Data Centers (2), Altum Digital Infrastructure (1), H5 Data Centers (1), LightEdge (1).
What is the total data center power capacity in St. Louis?
Facilities that publish capacity add up to 4 MW (2 of 8 sites disclose a figure); the largest published site is Altum Digital Infrastructure St. Louis with 3.9 MW.
How much does colocation cost in St. Louis, United States?
No published wholesale $/kW benchmark exists for St. Louis, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in St. Louis, United States?
Commercial electricity in St. Louis, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near St. Louis, United States?
St. Louis, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full St. Louis, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| TierPoint St. Louis (Olive St.) | TierPoint | — | — | Operational |
| TierPoint St. Louis (Locust St.) | TierPoint | — | — | Under construction |
| Altum Digital Infrastructure St. Louis | Altum Digital Infrastructure | 3.9 | — | Operational |
| H5 Data Centers St. Louis | H5 Data Centers | — | — | Operational |
| Netrality Data Centers St. Louis (210 N. Tucker) | Netrality Data Centers | — | — | Operational |
| Netrality Data Centers St. Louis (900 Walnut) | Netrality Data Centers | — | — | Operational |
| LightEdge St. Louis Data Center | LightEdge | 0.36 | — | Operational |
| Cogent St Louis | Cogent Communications | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
United States
Colocation quotes in St. Louis: free, reply within one business day
Get Quotes →