IREN Sweetwater 1

Under construction

IREN Sweetwater 1 is a data center in Sweetwater, TX, United States, operated by IREN, with 1400 MW of published IT capacity, currently under construction.

Sweetwater 1 is a 1.4 GW grid-connected site in West Texas; IREN reported energization of the ERCOT connection in April 2026. It forms part of a planned 2 GW Sweetwater hub with closed-loop liquid cooling.

IREN Sweetwater 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction

5 of 14 fields published · Operator? Add or correct data →

Units
Operator
IREN
City
Sweetwater, TX, United States
Power, MW
1400 MW
Cooling
Liquid
AI-ready
Yes
Market benchmark
$196 per kW per month wholesale · United States
Index rate for the market, not this operator’s price list

1 sources · data pending on-site verification

—

Coloprice Score

22 out of 100

limited data · #648 of 1349 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
IREN Sweetwater 1 — Coloprice Score 22
<a href="https://coloprice.com/data-centers/usa/sweetwater/iren-sweetwater-1-tx/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/iren-sweetwater-1-tx.svg"
    alt="IREN Sweetwater 1 — Coloprice Score 22" height="64">
</a>

Sweetwater 1 is IREN's grid-connected site in West Texas, described in the company's March 2025 press release (filed with the SEC as a 6-K exhibit) as an existing 1.4 GW connection. The same release announces a binding 600 MW agreement for the neighbouring Sweetwater 2, roughly 28 miles away, and a planned fiber loop linking the two into a 2 GW Sweetwater hub; IREN states 2.75 GW is secured across West Texas including its Abilene site. IREN gave April 2026 as the energization date for Sweetwater 1 and late 2027 for Sweetwater 2, and later reported the ERCOT connection energized. Marketing points include renewable-rich ERCOT power, diverse fiber paths, about 6 ms latency to Dallas, and closed-loop liquid cooling to cut water use. The 1.4 GW figure is grid connection capacity, not installed IT load, and the company has not published data hall counts, rack density or a completion date for the data center buildings.

  • ▮1.4 GW grid connection for Sweetwater 1, per IREN's March 2025 release.
  • ▮Sweetwater 2 adds 600 MW under a binding grid agreement, energization late 2027.
  • ▮Planned fiber loop to form a 2 GW Sweetwater hub.
  • ▮About 6 ms latency to Dallas and closed-loop liquid cooling stated by IREN.
  • ▮Figure is grid capacity, not installed IT load.

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Sweetwater, TX

FacilityOperatorPower, MWTierStatus
IREN Sweetwater 1IREN1400—Under construction
IREN Sweetwater 2IREN600—Announced

Source — Verified against operator sources · data pending on-site verification

  • IREN Sweetwater press release (SEC 6-K)