2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Sweetwater, TX: 2 facilities, colocation pricing
How many data centers are in Sweetwater, TX?
Coloprice tracks 2 data centers in Sweetwater, TX, United States: 0 operational, 1 under construction and 1 announced, run by 1 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.117
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 AI-ready · 2,000+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Sweetwater, TX, United States | · · · | $0.117 | 2 | — |
| Germany | $250 | $0.269 | 274 | — |
| United Kingdom | $213 | $0.454 | 199 | — |
| Japan | $280 | $0.185 | 150 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Sweetwater, TX?
Coloprice tracks 2 data centers in Sweetwater, TX, United States: 0 operational, 1 under construction and 1 announced, run by 1 operators.
Which operators run data centers in Sweetwater, TX?
By number of facilities tracked: IREN (2).
What is the total data center power capacity in Sweetwater, TX?
Facilities that publish capacity add up to 2,000 MW (2 of 2 sites disclose a figure); the largest published site is IREN Sweetwater 1 with 1400 MW.
How much does colocation cost in Sweetwater, TX, United States?
No published wholesale $/kW benchmark exists for Sweetwater, TX, United States yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Sweetwater, TX, United States?
Commercial electricity in Sweetwater, TX, United States is $0.117 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 2 of them announced or under construction.
Where is colocation cheaper near Sweetwater, TX, United States?
Sweetwater, TX, United States sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Sweetwater, TX, United States market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| IREN Sweetwater 1 | IREN | 1400 | — | Under construction |
| IREN Sweetwater 2 | IREN | 600 | — | Announced |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
United States
Colocation quotes in Sweetwater, TX: free, reply within one business day
Get Quotes →