Market comparison
Katowice, Poland vs Warsaw, Poland
Both columns are built from the catalog and the price index: Katowice — 6 facilities from 6 operators, Warsaw — 25 facilities from 17 operators. Where a benchmark or a tariff is not published, the cell says so.
Katowice, Poland
6
Tracked facilities · Operators: 6
Wholesale benchmark, $/kW/month: not published
Warsaw, Poland
25
Tracked facilities · Operators: 17
Wholesale benchmark, $/kW/month: not published
Markets side by side
| Field | Katowice | Warsaw |
|---|---|---|
| Tracked facilities | 6 | 25 |
| Operators | 6 | 17 |
| Published IT capacity | not published | 154 MW (8 of 25 sites publish) |
| Operational | 6 | 24 |
| Under construction / announced | 0 | 1 |
| Tier III+ certified sites | 1 | 1 |
| Sites with any certification | 1 | 13 |
| Liquid-cooled sites | 0 | 1 |
| AI-ready sites | 0 | 1 |
| Wholesale benchmark, $/kW/month | not published | not published |
| Benchmark change, yoy | not published | not published |
| Industrial power tariff, $/kWh | $0.177 | $0.177 |
| Average Coloprice Score | 11/100 across 6 sites | 23/100 across 25 sites |
| Latency between the two | not published | |
Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Katowice — 6; Warsaw — 25
- Operators: Katowice — 6; Warsaw — 17
- Operational: Katowice — 6; Warsaw — 24
- Under construction / announced: Katowice — 0; Warsaw — 1
- Sites with any certification: Katowice — 1; Warsaw — 13
- Liquid-cooled sites: Katowice — 0; Warsaw — 1
- AI-ready sites: Katowice — 0; Warsaw — 1
- Average Coloprice Score: Katowice — 11/100 across 6 sites; Warsaw — 23/100 across 25 sites
Published for only one side: Published IT capacity.
Top facilities by score
Katowice, Poland
- Euro-Centrum Katowice Data Center PNT Euro-Centrum
- PSE Jordana PSE Poludnie
- ATMAN Data Center Katowice-1 (KTW-1, Altus) Atman
Warsaw, Poland
- Atman WAW-3 Atman · 14.4 MW
- Equinix WA1 Equinix
- Equinix WA2 Equinix
Open Katowice data centers →Open Warsaw data centers →Colocation pricing in Katowice →Colocation pricing in Warsaw →
Other comparisons
Katowice vs PoznańKatowice vs WrocławPoznań vs WarsawWarsaw vs Wrocław