Abu Dhabi, United Arab Emirates vs Dubai, United Arab Emirates

Both columns are built from the catalog and the price index: Abu Dhabi — 32 facilities from 8 operators, Dubai — 18 facilities from 9 operators. Where a benchmark or a tariff is not published, the cell says so.

Markets side by side

FieldAbu DhabiDubai
Tracked facilities3218
Operators89
Published IT capacity734 MW (28 of 32 sites publish)463 MW (10 of 18 sites publish)
Operational2814
Under construction / announced44
Tier III+ certified sites43
Sites with any certification44
Liquid-cooled sites11
AI-ready sites42
Wholesale benchmark, $/kW/monthnot publishednot published
Benchmark change, yoynot publishednot published
Industrial power tariff, $/kWh$0.11$0.11
Average Coloprice Score25/100 across 32 sites22/100 across 18 sites
Latency between the twonot published

Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Tracked facilities: Abu Dhabi — 32; Dubai — 18
  • Operators: Abu Dhabi — 8; Dubai — 9
  • Published IT capacity: Abu Dhabi — 734 MW (28 of 32 sites publish); Dubai — 463 MW (10 of 18 sites publish)
  • Operational: Abu Dhabi — 28; Dubai — 14
  • Tier III+ certified sites: Abu Dhabi — 4; Dubai — 3
  • AI-ready sites: Abu Dhabi — 4; Dubai — 2
  • Average Coloprice Score: Abu Dhabi — 25/100 across 32 sites; Dubai — 22/100 across 18 sites

Top facilities by score

Abu Dhabi, United Arab Emirates

Dubai, United Arab Emirates

Open Abu Dhabi data centers →Open Dubai data centers →Colocation pricing in Abu Dhabi →Colocation pricing in Dubai →