Operator comparison
Africa Data Centres (Liquid Intelligent Technologies) vs Open Access Data Centres (WIOCC)
Both columns come from the facilities each operator publishes and Coloprice tracks: Africa Data Centres (Liquid Intelligent Technologies) — 5 facilities in 3 countries, Open Access Data Centres (WIOCC) — 12 facilities in 2 countries. Score is the independent Coloprice Score of each facility, averaged; it is never sold.
Africa Data Centres (Liquid Intelligent Technologies)
5
Tracked facilities · Countries: 3
Where they operate: Kenya, Nigeria, South Africa
Open Access Data Centres (WIOCC)
12
Tracked facilities · Countries: 2
Where they operate: Nigeria, South Africa
Portfolios side by side
| Field | Africa Data Centres (Liquid Intelligent Technologies) | Open Access Data Centres (WIOCC) |
|---|---|---|
| Tracked facilities | 5 | 12 |
| Countries | 3 | 2 |
| Cities | 5 | 11 |
| Published IT capacity | 28 MW (2 of 5 sites publish) | 72 MW (12 of 12 sites publish) |
| Operational | 5 | 12 |
| Under construction / announced | 0 | 0 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 0 |
| Most common certifications | ANSI/TIA-942-B Rated-3 Constructed Facility, ISO 27001, PCI DSS, Uptime Institute Tier III Certification of Design Documents | ISO 27001, Uptime Institute Tier III Certification of Design Documents, ISO 14001, ISO 45001 |
| Average Coloprice Score | 29/100 across 5 scored sites | 28/100 across 12 scored sites |
| Awards and badges | 5 | 6 |
| Highest-scored facility | Africa Data Centres NBO1 (45/100) | OADC Isando JNB1 (57/100) |
Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Africa Data Centres (Liquid Intelligent Technologies) — 5; Open Access Data Centres (WIOCC) — 12
- Countries: Africa Data Centres (Liquid Intelligent Technologies) — 3; Open Access Data Centres (WIOCC) — 2
- Cities: Africa Data Centres (Liquid Intelligent Technologies) — 5; Open Access Data Centres (WIOCC) — 11
- Published IT capacity: Africa Data Centres (Liquid Intelligent Technologies) — 28 MW (2 of 5 sites publish); Open Access Data Centres (WIOCC) — 72 MW (12 of 12 sites publish)
- Operational: Africa Data Centres (Liquid Intelligent Technologies) — 5; Open Access Data Centres (WIOCC) — 12
- Most common certifications: Africa Data Centres (Liquid Intelligent Technologies) — ANSI/TIA-942-B Rated-3 Constructed Facility, ISO 27001, PCI DSS, Uptime Institute Tier III Certification of Design Documents; Open Access Data Centres (WIOCC) — ISO 27001, Uptime Institute Tier III Certification of Design Documents, ISO 14001, ISO 45001
- Average Coloprice Score: Africa Data Centres (Liquid Intelligent Technologies) — 29/100 across 5 scored sites; Open Access Data Centres (WIOCC) — 28/100 across 12 scored sites
- Awards and badges: Africa Data Centres (Liquid Intelligent Technologies) — 5; Open Access Data Centres (WIOCC) — 6
- Highest-scored facility: Africa Data Centres (Liquid Intelligent Technologies) — Africa Data Centres NBO1 (45/100); Open Access Data Centres (WIOCC) — OADC Isando JNB1 (57/100)
Highest-scored facility
Africa Data Centres (Liquid Intelligent Technologies)
Africa Data Centres NBO1
Nairobi, Kenya · 7.5 MW · 45/100
Open Access Data Centres (WIOCC)
OADC Isando JNB1
Isando, Johannesburg, South Africa · 12 MW · 57/100
Open Africa Data Centres (Liquid Intelligent Technologies) profile →Open Open Access Data Centres (WIOCC) profile →
Other comparisons
Africa Data Centres (Liquid Intelligent Technologies) vs Teraco (Digital Realty)Open Access Data Centres (WIOCC) vs Teraco (Digital Realty)